Gateway BP(2.4)-CS 981229DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gateway Business Park, Lots I and 2, Block~4~, and Lot 1 and Common Area
1, Block B, Final Plat, to allow the creation of 3 new lots and the development
of a 2-story 103, 611 square foot oj~ce building on Lot 2 located along the
north side LH. 635 and east of Freeport Parkway, at the request of Halff
Associates, ln~
DRC DATE: December 29, 1998 and January 7, 1999
CONTA CT: Mike Martin, P.E., Assistant City Engineer (9 72-304-3 6 79)
COMI~ENT STATUS: ,/PRELIM1NAR Y .vrr'.~ ..r ,I...,r
I
1. Show the right-of-way width of all adjacent streets.
2. Provide a left-mm lane off of Freeport Parkway into Dividend Drive.
3. Change text "Flood Plan Notes" to Floodplain Notes.