Gateway BP(2.4)-CS 940729FROM: DATE: RE: REX GORE, PRESIDENT JOAN M. WILLIAMS~ JULY 29, 1994 ~ CC: PRE.CONSTRUCTION MEETING - 7/29/94 GATEWAY BUSINESS PARK - PHASE ll-C COPPELL, TX I, ATTENDANCE: o Clean Cut, Inc. - Bill Mills / $oan Williams o Catellus Development - K, aren Moons o City of Coppell - ~Iim Ragsdale, Purchasing Dopt. / lien Griffin, Cir, o Im*Tech Corp. - James Pole II. ISSUES: Proposed Chanae Order (Alternate g2): Jim Ragsdal for an explanation of the increase on AI~ gl,in the .amp explainecl thai Brian Bristow of Albert Haliff had Alternate g2 as Base Bid Specs. The additional cost is for u to 4" and thc addition of imported tops~l for the. p.u .rlx~e' .of throughout the site. Jim inquired how Catellus felt aoou~ mi Karen indicated that the uee size increa~ would be in kgpir ae~stheti~ of the projeet lands~_ _.ping, pecial!y sin Freeport is highly visible, Jim indicated that he woula li~e decision until Kon Griffin arrived at the n~eting. Upon Ken's arrival, the discussion continued on thc propo~ was Ken's feeling that thc project architec~ ~hould make tl).e the city. Ka~n explained that they were out of the loop smc their scope of work.u~..d~,~r their existing conUact with _Ca__telll a letter from Albert Haliff recommending the change, l~en i a copy of the letter so .he ~ app?. v..e.t, he than.g? ord. er., Ke.] concern ovex the fact that AlOert r~ami was not mvoivea a~ ~ kTTENDEES asked Bill Mills nt of $7,089. Bill 2lean Cut to bid ~l~ding trees fr~a 2" proposed chan~. .g with the overall net of C~$ and hold off on any ~ changc order. It 'ecomme~on to they had completed ~s, but that she recalls sked that she fax him expressed his deep Ms juncture. otter questions he wanted clanfica,on o~.: ...r3j?n ~no,wt.~gea clcfmitely an attitude problem on Albert Halin's par~, her boss, John $nd try to resolve the matter. Ken asked who, inckxxt was the engineer overseeing _t~i.'s pr, ~ject? Karen indicated it was a joiut responsibility between Catellus and the C~ty.ol' Coppell. Bill Mills asked who would actually be on site inspecting the work m ~rogress. He felt that 800 STADIUM DRIVE Alii .I~OTON, TX 76011 Oamway Minutes July 29, lg~24 Pate Two for everybccly's protection, that either a city inspector ~r pr?j( on-site for inspecting rebar, concrete pours, irrigation line ins Cut has hired Term-Mar for purposes of testing our construct Test results will be forwarded to Catellus and City of Coppel ensued over the inspect/au issue. Ken s_tated, that as he .u~nder wn/ved the inspection fees based on the fact that the PID the en~ec~r tn conduct on-site inspect/om and that fund~ we~ that purpose. It w~ sugg~t~/b~ Ken that..Kar~.n. ,a~.~Ji.m r~ Docu~en~ to re~olve the confus/on over Albert I-talRx's mvo Karen stated she would g~t on th/s immed/amly and hoped to all present by noon this date. .a~ Karen acknowledted receipt of Clean be a.p ,~.,ving them. Bill thought thal; ¢ charge of approvint them jointly with Albert Haliff baaed on and then process them through the Ci~ of Coppdl for paymc following month. Until such time as me inspection issue is r hold our application. Bill reminded her that the issue needed quickly in order to aflow the processing and payment of our I : Jim Rasdale advised that the city had permits on contr~t since the work was all landscaping. that Irti*Tech had already obtained their required permits. Wall l/Leloestlon: Bill asked Karen if she had found out a regarding the Wail relocat/on at the N'~C of Gateway and Nrc that she would have to get with new property owners at that back to us. James Pole stated that he would have to hold off and spray heads around the wall until this issue was resolve~ Work Schedule: Bill indicated that we already have the Tl installed and were awn/ting TU~s inspection/approval. We h demolition work and the irrigation installation is underwayc~ sides of Gateway and berming has been complete& B. ill in ' appw~.!ma~ly 40% s~ppin8 on the tre? to.l~lp, av.o~d a~ m since it is so late in thc digsing season, out utat u~e u~cs wo~ approximately foul weeks. Bill indicated that he anticipates ~ around the end of September, weather permittins. eeJames Pole requested a set of ~ would havc to come from All: would see about obtn/n/ng them. 800 8TADIUM DRIVE ARL/NOTON, TX 7~011 ,~t engineer should be ~allatioa, etc. Clean LOll l~eriais, etc, ,. Further di~'assion ~ood it, the dry anents called for e made available for ~,arch the PID .vement in the project, have an ~awer to cut's Pay AI~pl. #1, ~atellus woul8 be in their site inspeclions nt on the lSth of the ;solved, Karen will to be resolved ~ay Application. ~vaived building [ames Pole indicated ty further information ~port. Karen stated ocat/on and advise installing the laterals Electric conduit ye started the th trenching on both cated that we would do eproducible irrigation crt Haliff and she Crateway Minutes ~uly 29, 1994 Pase Three AC~!O~ 7. o James Pole contaoted TU Electric ~d their ~ indi?! were install~l at a 35~ dc. pth. But James sa~d they hit the surface. o Bill indicate~ that ulltil the inspection issue wa~ rcsol' off on pouring the walls. Meeting adjourned at 9: ~ that their lines the lines 18" below ged. we would hold 800 STADIUM DRIVE AI~.r~OTON, TX THESE MINUTES REFLECT OUR BEST RECOLLECTI0~N OF_ T_.~I'~. ~IS~CyS. S~I~NS ITEMS NEED REVISION OR ~ (10) DAYS; OTHERWISE, WE WILL ASSUMP. THI;¥ ~ cot, u,m~, A~ PRESENTED.