Lakewood A-CS 940127 5. There is a potential traffic problem associated with the intersection of MacArthur
Blvd. with Beltline Road. The Developer should be prepared to discuss that and the
effects that the extension of Bethel School Road to MacArthur Blvd. will have on the
problem at the Planning and Zoning and City Council meetings.
6. All fees associated with this project should be paid.
8. Park 'N Fly, Preliminary Plat, located along the northeast corner of Royal Lane and
Cotton rd., at the request of Mr. Bill Thompson.
No plat was provided.
9. Replat of Gateway Business Park, Block 2, abandonment of replat, located at the
northwest corner of Cotton Road and Freeport Parkway.
1. It is my understanding that the replat will vacate the previous plats and eliminate the
existing right-of-way associated with the extension of Southwestern Drive. I have a
concern with this due to the development of the property on the west side of this plat
i.e., the Park' N Fly Addition. That property is being developed in such a way that
the drainage will discharge into what is now the Southwestern Drive right-of-way.
If that right-of-way is vacated and/or abandoned the property to the west will not
have a place to discharge its water. Some means of providing an easement or
maintaining the existing Southwestern Drive right-of-way should be provided.
10. Lakewood Replat
1. The easement on the south side of lot 25, Block D should be better dimensioned.
2. The drainage easement on the east side of lot 34, Block D should be dimensioned.
11. The Estates of Cambridge Manor.
1. Minimum finish floor elevations should be provided for lots 1-8, Block C and lot 5,
Block E.
2. This property will need to be annexed into the Municipal Utility District.
3. All proposed easements should be shown on the plat.
4. The drainage layout should be reevaluated. Specifically there should be consideration
given to how the drainage area south of lot 3, Block B and east of lot 10, Block B
will drain in the future.
5. Escrow will be required for DeForest Road.
6. The flood study should be revised prior to any work in Phase 2