Loading...
WA9302-LR 960208 (3) EOTECH N ICAL E GEE Consultants, Inc. E NVI RONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: February 8, 1996 Date Concrete Placed: January 10, 1996 Standard 6"x12" Cl'em: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 107 Contractor: Natgun Corporation Project 1'4o.: 95 -0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panel MATERIALS So~ce/ .aa w~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batched: 9:50 am Cement: Time Sampled: 10:30 am FI,, Ash: Sample Location: WE-3 Truck/Ticket No: 104/17657 Ccarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 53°F Fine Aggregate: Concrete Range: 56°F ACmixtures: Slump Range (inches): 9" Weather Conditions: Partly Cloudy 1 Time Started: 9:15 am 2 Time Completed: 6:30 pm Added Water: 25 gal. Sample Air Content (%): 7% Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 379 9" 7 01/17/96 143,620 5,080 Slump before super plasticizer was CWT 380 9" 28 02/07/96 170,120 6,020 21A" CWT 381 9" 28 02/07/96 167,920 5,940 ,~st Methods Utilized Fracture Regular STM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P.C./Vq.I. Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GF,;g C.m~sultams, he. Reviewed by:f(~~