Loading...
WA9302-LR 960206 (2)['~'EOTECHNICAL E GEE Consultants, Inc. E ~ NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: February 6, 1996 Date Concrete Placed: January 5, 1996 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 89 Contractor: Natgun Corporation Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panel and Dome Panels MATERIALS s~rc~/ Ba~:. w~. INSPECTION DATA De scription (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batched: 10:40 am Cement: Time Sampled: 11:30 am Fly Ash: Sample Location: WF-2, 2B-5 Truck/Ticket No: 129/95592 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 38°F Fine Aggregate: Concrete Range: 54°F Admixtures: Slump Range (inches): 4~'' Weather Conditions: Cloudy 1 Time Started: 9:30 am 2 Time Completed: 6:00 pm Added Water: 10 gal. Sample Air Content (%): 7% Total Cubic Yards Placed: 20 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Spechnen Measured Age Date Total Load Compressire Strength Number Slap (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) Remarks CWT 322 4 ¼" 7 01/12/96 133,880 4,740 Slump before super plasticizer was CWT 323 4 ¼" 28 02/02/96 172,440 6,100 23~" CWT 324 4 ¼" 28 02/02/96 170,040 6,010 Test Methods Utilized Fracture Regular ASTM C-31,C-39,Cd43 (Unless Noted Otherwise) Cylinders Made By: P.C. __ o ..... i~ ^_~,~, Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GIglg Ccmsuita~s, lame. Reviewed by~,~