Loading...
WA9302-LR 960206 (7)EOTEC H N ICAL E GEE Consultants, Inc. E~ NVIRON~FNTAL REPORT OF CONCRETE MIX INSPECTION Report Date: February 6, 1996 Date Concrete Placed: January 16, 1996 Standard 6"x12" Client: Natgun Corporation Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 137 Contractor: Natgun Corporation Project No.: 95-0258 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panel MATERIALS Source/ Batch W~. INSPECTION DATA De scription (Lbs./Cu, Yd) Mix Number: Time Sample Batebed: 11:22 am Cement: Time Sampled: 12:20 am Sample Location: WE-6 Fly Ash: Truck/Ticket No: 196/18214 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 60°F Fine Aggregate: Concrete Range: 63°F Slump Range (inches): 6th'' Admixtures: Weather Conditions: Parity Cloudy 1 Time Started: 8:15 am 2 Time Completed: 4:30 pm Added Water: 20 gal. Sample Air Content (%): 61/2 % Total Cubic Yards Placed: 30 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 473 6V2" 8 01/24/96 158,800 5,620 Slump before super plasticizer was CWT 474 61/2" Hold Hold 11/2" CWT 475 6th" Hold Hold est Methods Utilized Fracture Regular Cylinders Made By: P.C. STM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: ~ ~ cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea Reviewed by: