Loading...
WA9302-LR 960206 (4)['~EOTECHNICAL 'T E GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 'o Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: February 6, 1996 Date Concrete Placed: January 16, 1996 Standard 6"x12" Client: Natgun Corporation Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 134 Contractor: Natgun Corporation Project No.: 95-0258 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Locatior~ of Placement: Wall Panel MATERIALS s ..../ t, at~ W~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batched: 9:50 am Cement: Time Sampled: 10:55 am Flv Ash: Sample Location: WB-6 ' Truck/Ticket No: 170/18199 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 50°F Fine Aggregate: Concrete Range: 58°F Admixtures: Slump Range (inches): 61/2'' Weather Conditions: Cloudy 1 Time Started: 8:15 am 2 Time Completed: 4:30 pm Added Water: 5 gal. Sample Air Content (%): 21/2% Total Cubic Yards Placed: 10 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq. ln.) UWT 463 61/2" 8 01/24/96 144,660 5,120 Slump before super plasticizer was UWT 464 61/2" Hold Hold 2 ¼" UWT 465 61/2" Hold Hold UWT 466 61/2" :st Methods Utilized Fracture Regular ~TM C-31,C-39,C-143 (lJnless Noted Otherwise) Cylinders Made By: P.C. Renlarks and/or Distribution: ~ cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks ~ Shimek, Jacobs and Finklea GEE Gmnlam, lame. Reviewed by: