Loading...
Lakeside V2-CS 960115 Coppell, Texas 75019 ~~;~Oe' BCO~ty477ith A Beautiful FuturecOppell, Texas 75019 214-462-0022 January 15, 1996 Kroger Company Jeffery R. Krueger 100 Kroger Drive Keller, Texas 76248 RE: Kroger at MacArthur Blvd. and Sandy Lake Road Escrow / Roadway Impact Fee Calculations Dear Mr. Kmeger: Enclosed is a copy of the City of Coppell Escrow/Roadway Impact Fee calculations for Krogers at MacArthur and Sandy Lake Road. During the development review process it was noted that Roadway Impact Fees would be required for this site. We have evaluated both the Roadway Impact Fee and the Street Escrow Fee and based on our current Roadway Impact Ordinance, we can assess the lesser of the two. In this case, that means that the Street Escrow applies. Please make payment to the City of Coppell in the amount of $72,936.00 and forward it to Jennifer Armstrong, Interim Finance Director, along with a copy of the fee calculations. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Interim Finance Director Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Interim Street Superintendent Rick Wieland, Parks Development Coordinator ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: Lakeside Village Phase II, Kroger DATE: 1/10/96 STREET ESCROW: Street Name(s) Sandy lake Road Street Type P4D/6 Cost per Foot S160.00 Length of Adjacent Frontage (Linear Feet) i 455.85 IEscrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $72,936.00 ROADWAY IMPACT FEE: Service Area * 3 Catego~ ** Commercial Land Use ** Shopping Center Building Size (Sq. Ft.) i 60,932 Development Units ** 60.932 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $87,193.69 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.