Loading...
Lakeside V2-CS 951221 ~ Engineers & Planners 2630 Wes,, Freeway. Suite I00. Fo~ Wor:h. TX 76102 * !817!429-7560 · (817'429-9322 FAX December 21, 1995 Mr. Kem~cth Griffin, P.E. Assistant City Manager/Cie,' Engineer City of Coppell 255 Parkway Blvd. Coppell. Texas 75019 RE: Lakeside Village Phase II. Kroger Store JBM No. 94-892.00 Dear Mr. Griffin: We have been in phone contact with Mr. Mike Martin of your office with regard to our plan submittal of November 17, 1995. Based on those conversations, submitted herewith are three sets of final plans for construction of thc site improvements. Our discussions with Mike primarily' centered around the improvements to the Sandy Lake right-of-way- and the strip of land bemeen Sandv Lake and our south line of parking. From those conversations and mx' contact with Kroger, it has been determined to construct the brick pavers for thc Sandy Lake driveways as part of our site construction, rather than leaving them for 'later. However, due to the impending public improvements to Sandy Lake. it is our &sire to postpone installation of landscaping and irrigation in this area until after the street is improved. A cop3' of the revised landscape plan is enclosed, and revisions to the irrigation plan are currently being made. In addition to the changes Mike and I have discussed, there have been some very minor modifications to the building dimensions which have been reflected on these plans, sheets 5 and 7. We will submit the revised landscape and irrigation plans to Building Inspections next week. A contractor has been selected and has begun to move onto the site. They have been in contact with Building Inspections with regard to a Pre-construction meeting, fees and permits. They will also be submitting an NOI shortly. We are processing the plat to get utility and oxxner signatures, and will submit it later in the construction process. It is my understanding that we should be ready to get construction underway. Please feel free to contact me if there is an.x.~hing else that must be accomplished. Thanks for 5'our cooperation and that of your staff. Sincerely, JBM Engineers & Planners. Inc. Gary k. \. ict~en:. P.E. Project Manager Kansas Ci~.-. Missouri Des Moines. Iowa Dallas For: Worth Austin. Texas Greenville. South Carolina O .m, ab, a. Nebraska C}:icago. Illinois..'Lenexa [.iberal Dodge CiE: Independence Grea: Bend. Kansas Raleigh.. North Carolina