Loading...
Latter-day-CS 951220COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM DATE: TO: FROM: RE: December 20, 1995 Larry Davis, Construction Inspector Howard Pafford, Utilities ~ Superintendent Follow-up Walk thru for Church of Lat (615 N. Macarthur) r Day Saints A follow-up walk-thru on the above referenced project was conducted on 12/20/95 and the items listed below have not been corrected. Pump out fire vault and clean out bottom. Clean out all 4 meter boxes below bypass pipe. Paint V on curb by each valve. All three double checks need to be tested and results sent to Water Utilities Dept. If you have any questions, please advise. HLP/dg