Loading...
WA9302-LR 960117 (4) EOTEC H N ICAL E I GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 17, 1996 Date Concrete Placed: January 4, 1996 Standard 6"x12" CI ent: City of Coppell Area 28.27 Square Inches Prt,ject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 81 Co ntractor: Natgun Construction Project No.: 95-0196 Ctlncrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS s ..../ Bat~,, W~. INSPECTION DATA Description ( Lbs./Cu. Yd) M x Number: 685 Time Sample Batched: 10:10 am Cement: Time Sampled: 11: 30 am Sample Location: 3A-4, 3B-4, 4B-3, 5B-3, 6B-3 FI', Ash: Truck/Ticket No: 161/17376 Ccarse Aggregate: Temperature: Intennediate Aggregate: Ambient Range: 46°F Fine Aggregate: Concrete Range: 56°F Ac mixtures: Slump Range (inches): 6" Weather Conditions: Clear 1 Time Started: 8:30 am 2 Time Completed: 6:00 pm A{ ded Water: 30 gal. Sample Air Content ( % ): 3 % Total Cubic Yards Placed: 20 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressivc Sirengrit Remarks Number Slunrp (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) 2WT 297 6" 7 01/11/96 127,340 4,500 Slump before super plasticizer was 2WT 298 6" 28 02/01/96 11/2" 2WT 299 6" 28 02/01/96 ~st Methods Utilized Fracture Regular Cylinders Made By: P,C. iTM C 31,C 39,C 143 (Unless Noted Otherwise) Rel ~arks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GE g Cm~smllams, Ihc. Reviewed bye, ~