WA9302-LR 960117 (6)]EOTECHN ICAL
E I GEE Consultants, inc.
EI NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
REINFORCING STEEL PLACEMENT
Report Date January 17, 1996 Test Date: January 11, 1996
Client City of Coppell General Report No.: 13
Project 6.0 MG Water Storage Tank Project No.: 95-196
Identification Field Inspection of Reinforcing Steel
Method of Test Visual Inspection
Results
On January 11, 1996 a representative of GEE Consultants, Inc. was present at the above
referenced project to perform reinforcing steel inspection:
Wall panels WB-4, WD-3, WA-5
Dome Panels 4B-8, 5B-8, 6B-8, 3C-8, 6C-8, 5C-8, 6D-8, 5D-7, 4D-7, 6A-8, 5E-7,
6E-7, 6F-7, 4C-8
The following discrepancies were noted and called to the attention of Bob, a representative of Natgun.
Panel 6A-8 had several bars missing
The above discrepancies were corrected as noted.
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimek, Jacobs and Finklea