Loading...
Latter-day-CS 940216The City With A Beautiful Future February 16, 1994 Mr. Michael Dowdey Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Dallas, TX 75248 RE: Church of the Latter Day Saints Development Fee Assessment Dear Mr. Dowdey: Enclosed is a copy of the City of Coppell development fee assessment list, a development fee calculations for Church of the Latter Day Saints. Please provide a check made payable to the City of Coppell in the amo~ forward it to Mr. Alan Johnson, Acting Finance Director, along with a cop list. Please provide our office a copy of the engineer's estimate or contracl construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any q hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer CCi Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician P.O. Box 478 Coppell, Texas 75019 214-462-0022 ong with a copy of the lnt of $13,825.00 and ~, of the fee assessment for this project so the verify payment of the aestions, please do not CITY OF COPPELL DEVELOPMENT FEES Date: February 16, 1994 Project: Church of the Latter Day Saints TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $12,025.~ 10 $12,025.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.~0 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee (MUD) $1,800.~~0 $1,800.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee - )- -0- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $50310 -0- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $189. ~0 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $2,680.!~8 -0- (100% due at Issuance of Water Meters) Water Meter Deposit $703)0 -0- (100%due at Issuance of Building Permit) Irrigation Meter Deposit $35.~)0 -0- (100%due at Issuance of Water Meters) Street Sign Fee - }- -0- (100%due prior to Acceptance of Project) Street Light Fee * -0- (100%due prior to Acceptance of Project) Park Fee - D- -0- (100% due prior to Council Approval) TOTAL $17,150.~}8 TOTAL AMOUNT DUE PRIOR TO $13,825.00 COUNCIL APPROVAL + Constructio n Inspection Fee (2 % of Pro ect Cost due prior to preconstruc Lion meeting) · This fee cannot be assessed until after TU Electric submits the lighting plan t~r the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: February 14, 1994 Engineering Department Public Works Staff Development Fees for Church of The Latter £ The following fees referenced project. Water Impact Fee: should be assessed and collecte 1 - 2" Domestic Meter/s = 8 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 18.5 ESU's @ $650.00 ea = $12,025.00 100% due prior to Council approval of the final plat Wastewater Impact (MUD) 1 - 2" Domestic Meter/s = Total 8 ESU's @ $225.00 ea = 8 ESU $1,800.00 100% due prior to Council approval of final plat. Wastewater Impact (City) N/A - Domestic Meter/s = Total ESU's @ $450.00 ea = ES~ 100% due prior to Council approval of the final plat Water Tap Inspection Fee 3 Connections @ $100.00 each = $300.00 100% due prior to issuance of building permit for resi the case of multi-family, commercial, retail, industl prior to issuance of meter). FEB i 4 'ay Saints d on the above 's ~ential. (Or in · ial, fee is due Development Fees Page 2 Sewer Tap Inspection Fee N/A Connections @ $100.00 each = $ 100% due prior to issuance of building permit. (Resid Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 2" Domestic Meters @ $189.10 ea 100% due prior to issuance of building permit for re Ail other development fees are due prior to issuance Water Meter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s @ 1 - 8" Fireline Meter/s @ $ $288.88 ea 2,402.10 ea Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) N/A Meters @ $30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meter @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. ential only) = $ 189.10 $identiai only. of meter/s. $288.88 = $ 2.402.10 = 2,680.98