Loading...
Latter-day-CS 930715CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE #: Latter Day Saints Addition, Block A, Lot 1 Prelimina P & Z HEARING DATE: C. C. HEARING DATE: July 15, 1993 August 10, 1993 LOCATION: SIZE OF AREA: CURRENT ZONING: Located approximately 1056 feet southeast MacArthur and Samuel Boulevard. 3.527 acres SF-9 REQUEST: Approval of a preliminary plat for construction of Jesus Christ of Latter Day Saints). APPLICANT: Presiding Bishop of Church of Jesus Christ of Latter Day Saints, A Utah Corporation (Owner) 61 East North Temple Street Salt Lake City, Utah 84150 (800) 200-4067 John R. Horton, AIA (Representative) P O Box 1537 Fort Worth, Texas (817) 534-0222 HISTORY: There has been no recent platting history on ti a request for a SUP for church use goes to 1993. TRANSPORTATION: MacArthur Boulevard is designated as a thoroughfare contained with 110 feet of righ ry Plat [rom the comer of of a church (Church lis property although Council on July 13, 3, six lane divided :-of -way. SURROUNDING LAND USE & ZONING: North - Single-family residential; SF-0 South - Single-family residential; SF-9 East Developing single-family; SF-9 West Vacant CISD property; SF-9 COMPREHENSIVE PLAN: Shows Iow-density residential uses as most a ANALYSIS: Basically, this plat is in good order. Attentio comments which came out of ur DRC sessior has expressed concern regarding draina attachment). Second, utility plans must be .~ and again related to drainage, a 20' drainage proper collection of off-site drainage must final plat can be received. Because these is~ being resolved, staff recommends approval ol provided the drainage, engineering and utility Engineering's memo are addressed prior to plat. ALTERNATIVES: 1) Approve the plat 2) Deny the plat 3) Modify the ATTACHMENT: 1) Preliminary Plat 2) Engineering Comments latst, stf ppropriate here. a is directed to three First, engineering e easements (see ~bmitted, and third, easement as well as ,e provided before a les are in process of ' the preliminary plat issues pointed out in ;ubmittal of the final