MEMORANDUM
Taryon Bowman, Planning and Zoning Coordinator
Kenneth M. Griffin, P.E. , City Engineer ~
Engineering Conunents for DRC 6/24/93 & 7/1/93
July 6, 1993
S-1067-SUP Request for gift shop - located at 416 Bethel Roa{
Phillip Jewett.
We briefly reviewed this request at the July 1, 1993 DRC meetin
Comments were as follows:
Escrow should be provided for the section of the property adj~
It was noted that the property is not being platted, therefo~
Department would like to pursue the use of the same type ot
utilized for the Chambers Addition i.e., no money switching hl
the property owner acknowledges that they will pay their fair sl~
the future.
2. The parking should be correctly shown and dimensioned on-sil
and employees.
Replat of Country Estates Block A, Lot 3 - located at 472 Corn
The Engineering Department had a concern whether or not th,
Block A, Lot 4 had been contacted about revising their drainage
reviewed the supporting documentation for the deletion of a po
easement and does not have a problem with it. However, it is o~
this has been withdrawn from consideration.
Park and Fly Addition, preliminary plat - located at the norths
and Cotton Road.
1. Sidewalks are required along Royal Lane.
2. The drive return radius should be a minimum 10 foot.
3. The width of the driveway should be shown and because of
should be provided for separation of egress and ingress traffic.
I, at the request of
The Engineering
:ent to Bethel Road.
· e, the Engineering
agreement that we
tnds at this time but
are at some point in
e for both customer
~try Estates Lane.
property owner of
~asement. Staff has
tion of the drainage
~r understanding that
ast corner of Royal
the width, a median
Latter Day Saints Addition Block A, Lot 1 preliminary plat - local
1056 feet from the southwest corner of MacArthur Blvd and San
Drainage easements should be provided for the on-site draina
concerned about the drainage plan as submitted and feel that it coU
in the future if it is allowed to be constructed as submitted.
purposing to cut a "temporary" ditch on the northwest side of th~
the water to a Y-inlet and then pick it up and take it parallel to
the existing storm drain system. The prospect of a open ditch
is unacceptable.
2. Utility plans should be provided. They should include the public
go off site onto the school property.
We need to see real drainage plans that include the proper cc
drainage. Also, any drainage system that transverses this pre
conveying water from another site should be contained within
drainage easement.
file/meetings/drc0624.93
ed approximately
~uel Blvd.
;e system. I am
~d create a problem
?hey are currently
~ property to route
IacArthur Blvd. to
~r a period of time
ewer line that will
[lection of off-site
perty that will be