Loading...
Latter-day-CS 930512To: From: RE: Date: MEMORANDUIVI Taryon Bowman, Planning and Zoning Coordinator Kenneth M. Griffin, P.E. , City Engineer Engineering Comments for DRC 4/29/93 - 5/6/93 May 12, 1993 ZC-548-Zoning Change Request - located along the north side approximately 1800 feet east of MacArthur Blvd. 1. Need Floodplain Study and Floodplain Development Permit 2. Need water and sanitary sewer information. 3. Escrow will be required for Deforest Road. (It is my understanding that this case has been dropped until the completed.) S-1066-SUP request for church - located approximately 1056 fee~ corner of MacArthur Blvd. and Samuel Blvd. (see comments fo~ Addition). Latter Day Saints Addition Block A, lot 1 - located approximatel~ southwest corner of MacArthur Blvd. and Samuel Blvd. An off-site easement will be required for the sanitary sewer We will need plans for the construction. If a deceleration lane is proposed for the northern most right-of-way will be required for the deceleration lane. Drainage plans will be required showing both on-site and off- onto this site. As discussed, the drainage system should tie storm drain line stubbed out near the intersection of Lake F{ Blvd. Also, the plans for Samuel Blvd. show a future 21' Samuel Blvd. to MacArthur Blvd. The development of this 1 into account the location of the 21" RCP and because it crc will need to be constructed with the development of this pn 4. Water and sanitary sewer plans should be provided. All necessary easements should be provided for any sewe~ lanes or storm drains. of DeForest Road ood study has been from the southwest Latter Day Saints 1056 feet from the >rth of the property. drive approach, then rite drainage coming into the existing 24" ,rest and MacArthur RCP coming from ~roperty should take sses this property it ~perty. lines, deceleration