Loading...
WA9302-LR 960116['~'EOTECHNICAL E GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 16, 1996 Date Concrete Placed: January 3, 1996 Standard 6"x12" CI ent: City of Coppell Area 28.27 Square Inches Pn,ject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 75 Co ntractor: Natgun Construction Project No.: 95 -0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Lccation of Placement: DO1Tle and Wall Panels MATERIALS So~r~/ ~a,~. W~. INSPECTION DATA Description ( Lbs./Cu. Yd) M!x Number: 685 Time Sample Batched: 10:05 am Cement: Time Sampled: 11:30 am FI,, Ash: Sample Location: 6E-2, WE-2 Truck/Ticket No: 116/17306 Coarse Aggregate: Temperature: Inletmediate Aggregate: Ambient Range: 39°F Fine Aggregate: Concrete Range: 52°F Ac mixtures: Slump Range (inches): 43~" Weather Conditions: Clear 1 Time Started: 8:30 am 2 Time Completed: 5:00 pm Acded Water: 25 gal. Sample Air Content (%): Total Cubic Yards Placed: 20 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load ' Compressivc Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 278 43~" 7 01/10/96 143,900 5,090 Slump before super plasticizer was CWT 279 43,4" 28 01/31/96 23,4" CWT 280 43~" 28 01/31/96 est Methods Utilized Fracture Regular Cylinders Made By: P.C. STM C-31,C-39,C-143 (Unless Noted Otherwise) Rer tarks and/or Distribution: Note: Slumb before super plasticizer was 2V2" cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbansi, Jr. - Natgun Corporation Mr. Gary Hendricks - ShimeL Jacobs and Finklea GEE C,umsultmmis, Inc. Reviewed by~l~,~