Loading...
Latter-day-CS 930520 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE #: S-1066 (The Church of Jesus Christ of Latter Day Saints Additi~ P & Z HEARING DATE: May 20, 1993 C. C. HEARING DATE: June 8, 1993 LOCATION: Fronting on the west side of MacArthur Boulevard, Boulevard. SIZE OF AREA: 3.527 Acres. REQUEST: Special use request for a church. APPLICANT: The Church of Jesus Christ of Latter Day Saints 61 East lq. Temple Street Salt Lake City, Utah 84150 John R. Horton P.O. Box 1537 Ft. Worth, Tex (817) 534-0222 HISTORY: There has been no recent zoning history on this tra~ TRANSPORTATIOIq: MacArthur Boulevard is an improved P6D major t divided street contained within 110 feet of right-of- SURROUNDING LAND USE & ZONING: Iqorth - single-family residential - SF-0 South - single-family residential - SF-9 East developing single-family residential - SF-~ West - single-family residential - SF-0 ITEM ~n) southeast of Samuel Architect :t. ~oroughfare, six-lane way. COMPREHENSIVE PLAN: The Comprehensive Plan shows low density single-fart this parcel. ANALYSIS: Because churches are identified as being compatible land use, this proposal meets the objective of our Cc A close look at the site plan reflects the appropriate br. adequate yard dimensions, and landscaping which a criteria of the Streetscape Plan. Our major development concern with this request rela circulation, and patterns of traffic generation. We that this church work with the Coppell Independent land owner adjacent on the west - to provide vehict site to Samuel Boulevard, probably parallel to the exi.~ have concerns relative to where MacArthur Boulev: provided, the potential need for a deceleration lane, alignments with existing median openings. Because Waffle study which will satisfactorily address these issu Other issues regarding drainage easements, fh'e hy, water and sanitary sewer issues will be addressed at ,, Suffice it to say here that these concerns must be sari at platting. If we receive satisfactory answers to our traffic-relate above, (we understand the applicant has hired a traffic these issues), and the site plan, landscaping, sc circulation, and aesthetic concerns are satisfactorily. would be in order. In that the traffic study has not ye staff review, we will leave judgements regarding all~ in limbo until a thorough analysis of the traffic data h - hopefully, before the public hearing. ALTERNATIVES: 1) Approve the zoning request 2) Deny the zoning request 3) Modify the zoning request ATrACHMENTS: s1066.stf 1) SUP Site Plan 2) Rendering ily development on with single-family ~mprehensive Plan. .ok screening walls, ~pears to meet the es to traffic access, a'ongly recommend ehool District - the ar access from this ting alley. We also trd access is to be and concerns about Df these concerns, a es is recommended. trant requirements, ,ubdivision platting. ffactorily addressed d concerns outlined engineer to address :reening provision, iddressed, approval t been submitted for xaffic related issues as been completed -