Loading...
Gateway BP(1.3)-LR 990215 F=i i=- E~ 1--~ ENVIRONME POST INJECTION CONFIRMATION RESULTS Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75036 ATTN: Mr. Robert McCann .~EOTECHNIC^L AND [~ ~ r'-i U P NTAL CONSULTANTS CONTRACTOR: Pacific Builders, Inc. AREA REPRESENTED: Building Pad REPORT NO. 11 REPOR~ DATE: 02-15-99 REG PROJECT NO. 5167 PAGE: 1 of 1 Boring Number/Pocket Pen .... .................. .... I= 02-02-99 0.0- 1.5 1.3 1.3 1.5 1.8 1.3 1.5- 3.0 1.5 2.0 1.8 2.5 1.5 3.0-4.5 1.8 1.7 1.0 1.8 1.6 4.5-6.0 2.0 2.0 0.8 4.0 4.5+ 6.0-7.5 1.6 2.5 2.0 4.5++ 3.6 7.5-9.0 2.3 2.8 1.6 4.5 3.3 9.0-10.0 2.3 3.9 3.1 4.5+ 4.5+ Comments: Distribution: 0.5 1.0 1.8 1.3 2.1 2.0 4.1 4.5+ 3.5 4.3 3.0 2.0 2.5 3.9 Borings obtained after four injection passes. Based on the te injections are not considered necessary. (1) Catellus Development Corporation/Mr. Robert McCann (1) Pacific Builders, Inc./ Mr. Jim Kinder (1) Potters Concrete/ Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Bob Williams (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone results, additional Submitted by: REED ENGINEE Original Signed Ronald F. Reed, US/je RING GROUP, INC. By P.E. 2424STUTZDR.- SUITE400 I DALLAS,~I'X7S235 · TEL [21413S0 5600 · FAX[2 4] ~500019