Loading...
Gateway BP(1.3)-LR 990210 I:NVIRONME REPORT OF WATER INJECTION OBSERVATI( Gateway Business Center ,~EOTECHNICAL AND NTAL CONSULTANTS IN Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann CONTRACTOR: Pacific Builders, Inc. REPORT NO. REPORT DATI REG PROJEC' TECHNICIAN: PAGE: 1 of 1 On the referenced dates a representative of Reed Engineering Group, Inc injection operations on the referenced project. The injection operatior accordance with project specifications unless otherwise noted. 6 :: 02-10-99 r NO. 5167 T. Stockdick observed water ~s proceeded in 10 5 100-200 12-18 2 4 11.5 5 01-29-99 40,320 190 4 01-30-99 33,600 190 4 01-27-99 28,000 190 4 01-28-99 45,920 190 4 Surfactant added at regular intervals: Yes Distribution: (1) Catellus Development Corporation/Mr. Robed McCann (1) Pacific Builders, Inc./ Mr. Jim Kinder (1) Potters Concrete/ Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Bob Williams (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEE Original Signed Ronald F. Reed MS/je RING GROUP, INC. By P.E. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] ;50 0019