Gateway BP(1.3)-LR 990127 ENVIRONM
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation REPORT NO. 9
4545 Fuller Drive, Suite 100 REG PR()JECT NO. 5167
Irving, Texas 75038 SAMPLE DATE: 01-27-99
ATTN: Mr. Robert McCann TECHNI(;:IAN: Contractor
CONTRACTOR: Pacific Builders, Inc.
Location of Sample
Design Information
1 N/R N/R 3000
Test Results
1 8847 02-03-99 7 89940 3180
8847 02-24-99 28
8847 02-24-99 28
8847 Hold
Cylinder Data
I i .... 8847 .........N')'R ..................
Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Bob Williams
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR. · SUITE 400 ·
Distribution: (1)
Submitted by:
REED ENGINEE
Original Signed
Keith E. Atkins
KEA/cdl/rt
GEOTECHNICAL AND E~ R r-1 II p
:'NTAL CONSULTANTS
:lNG GROUP, INC.
~y
DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019