Loading...
Gateway BP(1.3)-LR 990121 ENVIRONM REPORT OF WATER INJECTION OBSERVATI( Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. REPORT DAT REG PROJEC TECHNICIAN: PAGE: 1 of I CONTRACTOR: Pacific Builders, Inc. On the referenced dates a representative of Reed Engineering Group, Inc injection operations on the referenced project. The injection operatio~ accordance with project specifications unless otherwise noted. GEOTECHNICAL AND ~ F:~ r'-I I I p [NTAL CONSULTANTS )N 2 =: 01-21-99 r NO. 5167 T. Stockdick observed water ~s proceeded in 10 5 100-200 12-18 2 4 11.5 5 01-11-99 35,260 190 01-12-99 2,240 190 25,220 190 13,440 190 01-13-99 7,360 190 12,440 190 01-14-99 18,640 190 01-15-99 26,060 190 01-16-99 19,620 190 2,700 190 01-17-99 28,820 190 01-18-99 42,400 190 Surfactant added at regular intervals: Yes Distribution: (1) Catellus Development Corporation/Mr. Robed McCann (1) Pacific Builders, Inc./ Mr. Jim Kinder (1) Potters Concrete/ Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Bob Williams (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 Submitted by: REED ENGINEI Original Signe¢ Ronald F. Reed MS/je · TEL [214] 350 5600 · FAX [214] 2 1 2 3 1 3 1 1 1 2 2 2 350 0019 [RING GROUP, INC. By P.E.