Gateway BP(1.3)-LR 990121 ENVIRONM
REPORT OF WATER INJECTION OBSERVATI(
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO.
REPORT DAT
REG PROJEC
TECHNICIAN:
PAGE: 1 of I
CONTRACTOR: Pacific Builders, Inc.
On the referenced dates a representative of Reed Engineering Group, Inc
injection operations on the referenced project. The injection operatio~
accordance with project specifications unless otherwise noted.
GEOTECHNICAL AND ~ F:~ r'-I I I p
[NTAL CONSULTANTS
)N
2
=: 01-21-99
r NO. 5167
T. Stockdick
observed water
~s proceeded in
10 5 100-200 12-18
2 4 11.5 5
01-11-99 35,260 190
01-12-99 2,240 190
25,220 190
13,440 190
01-13-99 7,360 190
12,440 190
01-14-99 18,640 190
01-15-99 26,060 190
01-16-99 19,620 190
2,700 190
01-17-99 28,820 190
01-18-99 42,400 190
Surfactant added at regular intervals: Yes
Distribution:
(1) Catellus Development
Corporation/Mr. Robed McCann
(1) Pacific Builders, Inc./
Mr. Jim Kinder
(1) Potters Concrete/
Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Bob Williams
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235
Submitted by:
REED ENGINEI
Original Signe¢
Ronald F. Reed
MS/je
· TEL [214] 350 5600 · FAX [214]
2
1
2
3
1
3
1
1
1
2
2
2
350 0019
[RING GROUP, INC.
By
P.E.