Gateway BP(1.3)-LR 990121 (2)FR E~ EE~ O
ENVIRONME
REPORT OF WATER INJECTION OBSERVATIC
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO.
REPORT DATI
REG PROJEC'
TECHNICIAN:
PAGE: 1 of 1
CONTRACTOR: Pacific Builders, Inc.
On the referenced dates a representative of Reed Engineering Group, Inc.
injection operations on the referenced project. The injection operatior
accordance with project specifications unless otherwise noted.
.~EOTECHNICAL AND
XlTAL CONSULTANTS
~N
: 01-21-99
r NO. 5167
T. Stockdick
observed water
s proceeded in
10 5 100-200 12-18
2 4 11.5 5
190
13,440 190
Surfactant added
Distribution: (1
(1
(1
(1
(1
(1
(1
(1
at regular intervals: Yes
) Catellus Development
Corporation/Mr. Robert McCann
) Pacific Builders, Inc./
Mr. Jim Kinder
) Potters Concrete/
Mr. Daniel Lewis
) AECC, Inc./Mr. Matt Rader
) Gromatzky Dupree & Associates/
Mr. Scott McCrary
) Brockette*Davis*Drake/
Mr. Bob Williams
) City of Coppell/Mr. Larry Davis
) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEE
Original Signe¢
Ronald F. Reed
KA/je
!RING GROUP, INC.
By
P.E.
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 50 0019