Loading...
Lauren Estates-CS 990611ENGINEERING DEPARTMEN~ FAX CO VER SHEET [] Urgent .., k,.~ (~,¢, ~z.~.o./~, cc, [] For Review [] Please Comment .Comments: [] Ple~,e Reply IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (9 Engineering- Excellence By Design P.O. Box 478 ~. TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 ling cover sheet) 12) 304-3679 [] As Requested DEVELOPMENT FEE TABLE ADJUSTMI ;NT Project: Lauren Estates Date: 6/11/99 Additional fees due TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,925.00 $2,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $30.77 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $135.66 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $675.00 $675.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Ava:.lable (100% due prior to Acceptance of Project I Street Sign Fee Information not Ava lable (100 % due prior to Acceptance of Project I Construction Inspection Fee Information not Ava ilable I TOTAL $3,846.43 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,600.00 DEVELOPMENT FEE WORKSHEET ADJUSTMI PROJECT: Lauren Estates DATE: 6/11/99 **Reason for Additional Fees: Delete one 5/8"x3/4" domestic meter, add one 1" domestic meter, add one 1 1/2" irrigation meter Water Impact Fee: Domestic Meter Deleted: ~- Domestic Meter Added: Irrigation Meter Added: Fireline Meter(s): 1 - 5/8 inch X 3/4 inch = 1 1 - 1 inch = 2.5 1 - 1 1/2 inch = 5 0 = 0 Total #: 6.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Deleted <--- Total #: 1 Domestic Meter(s) @ $25.67 Added Total #: 1 Domestic Meter(s) @ $56.44 Difference: (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $135.66 $0.00 $o.oo Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 1.5 @ $450.00 ea. Wastewater Tap Inspection Fee: Total 0: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 -'NT E.c,U's E~,U's E~ ,U's E~ ,U's $2,925.00 $50.00 $25.67 $56.44 $30.77 $135.66 $0.00 $0.00 $0.00 $30.00 $675.00 $0.00