Lauren Estates-CS 990429Dewayne Randle
4012 Hackmore Loop
Irving, TX 75061
Fee Assessment Letter
Park Development Zone: Zone 2
Dear Mr. Randle:
Enclosed is a copy of the City of Coppell Development Fee Assessment
a copy of the Development Fee calculations for the referenced developm~
Please make payment to the City of Coppell in the mount of $6,080.00
the Finance Department along with a copy of the Fee Assessment table·
portion of the assessed fees that need to be paid prior to Council approve
the attached table for additional fees· Also provide a copy of the Engine
contract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department
verify the payment of required fees and insure a successful beginning of
look forward to working with you on this project. If you have any q
contact me.
Sincerely,
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
PO. Box 478
CoppelI, Texas 75019
972-462-0022
April 29, 1999
FILE
able, along with
at.
and forward to
ttis amount is a
· Please refer to
er's estimate or
will help us to
this project. We
aestions, please
DEVELOPMENT FEE WORKSHEET
PROJECT: Lauren Estates
DATE: 4/29/99
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
2 - 5/8 inch X 3/4 inch = 2
0 = 0
0 = 0
0 = 0
Total #: 2 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 2 Domestic Meter(s) @ $25.67
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
2
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
E, ~
E, ~
E, ~ ;U's
E, ~ ~U's
$900.00
$100.00
$51.34
$0.00
$0.00
$o.00
$70.00
$0.00
$900.00
$100.00
$100.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
2 Single-family @ $1,285.00 per lot
0 Multi-family @ $1,285.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sis Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 2
$2,570.00
~.~
$1,710.00
Information not Available
Information not Available
Information not Available
DEVELOPMENT FEE TABLE
Project: Lauren Estates
Date: 4/29/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $900.00 $900.00
(10055 due prior to Council Approval)
Water Tap Inspection Fee $100.00
(10055 due at Issuance of Water Meter)
Water Meter Fee (Domestic) $51.34
(10055 due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(10055 due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $70.00
(10055 due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(10055 due at Issuance of Water Meter)
Wastewater Impact Fee $900.00 $900.00
(10055 due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(10055 due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(10055 due at Issuance of Building Permit)
Park Fee $2,570.00 $2,570.00
(10055 due prior to Council Approval)
Roadway Impact Fee $1,710.00 $1,710.00
(10055 due prior to Council Approval)
Street Light Fee Information not Avail able
(100 % due prior to Acceptance of Project II
Street Sign Fee Information not Avail able
(100% due prior to acceptance of Project II
Construction Inspection Fee Information not Avail able
II
tOTAL $6,501.34
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,080.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Lauren Estates
DATE: 4/29/99
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
bio. Lots/Units
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
~Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
6
Residential
tached
Sin[~le-Family De
2
2.85
$300
* (Figure 2- Roadway
** (Table 3 - Roadway
*** (Schedule 2, Page 3 - Roadway
$1,710.00
Impact Fee Study)
Impact Fee Study)
Impact Fee Study)