Loading...
Lauren Estates-CS 980407HARRISON ESTATES LOT 1 2 PROPOSED CHANGE TO P.. D, PLANNED DEVELOPMENT-I FOR SINGLE FAMILY USE. SITE PLAN SHALL MEET SF7 DEV STANDARDS WITH EXCEPTIONS AS DESCRIBED ON SITi ALL DRIVES SHALL BE PRIVATELY OWNED AND MAINTAINED B~ OWNERS. · SECURITY GATES SHALL BE'ACCESSIBLE BY ALL PROPERTY OW1 · PRIVATE DRIVES SHALL BE ACCESSIBLE BY ALL PROPERTY OWN · PRIVATE DRIVE TO LOT 3 SHALL BE 14' FEET WIDE. · ALL PRIVATE DRIVES TO BE 6 INCH CONRETE WITH//-3 REBARON INCH CENTERS ON 6 INCH SAND CUSHION. · TREES SHALL BE PLACED ON EACH SIDE OF PRIVATE DRIVE LEA] TO LOT 3 SPACED 18 FEET APART UP TO REAR OF HOMES PLACEI LOTS I AND 2, WHERE HOMES TOUCH 12 FOOT- BUILDING SET--B,a · 6 FOOT TALL WOODCRETE OR MASONRY FENCE SHALL BE PLACI "- REAR PROPERTY LINE AND AT EACH SIDE OF PRIVATE DRIVE LE~ TO LOT 3. FENCE SETBACK SHALL BE 13-FEETYROM SIDE'PROPEI~ LINE. FENCE SHALL EXTEND TO REAR OF HOMES PLACED ON LC AND 2 WHERE HOMES TOUCH 12 FOOT BUILDING SETBACK LINE. FENCE SHALL NOT BE REQUIRED AT GARAGE ACC ESS OF LOTS 2. · GARAGES LOCATED ON LOTS 1 AND 2 ACCESSED BY PRLVATE DI~ TO LOT 3 SHALL NOT FACE OR OPEN TO PRIVATE DRIVE. · SYNTHETIC STUCCO SYSTEM EQUAL OR SUPERIOR. TO 'DRIVlT SH BE ACCEPTED AND CONSIDERED MASONRY AS DEFINED UNDER SECTION 42 80 CITY OF COPPELL ZONING ORDIANCE CODE BOO[ ALL PLANS SHALL.BE SUBMITTED TO DEWAYNE RANDLE ARCHH FOR APPROVAL PRIOR TO CONSTRUCTION. ARCHITECT SHALL RE PLANS WITHIN 7 DAYS OF RECEIPT. IF PLANS HAVE NOT BEEN REVIEWED WITHIN 7 DAYS, PLANS SHALL BE CONSIDERED APPR( AND ACCEPTED. 24'~ )lNG )ON :D AT d)ING TY ~TS I AND kLL ~-CT /IEW SF9 2