Loading...
Lam Lee-CS 990309 Coppell, Texas 75019 (~~_~/~ :he City With A Beautiful Future, //_~.../ P.O. eOX~Zao.....,~.~x~s~o~ FraE M~ch 9, 1999 Christopher M. Jones, P.E. Pacheco Koch Consulting Engineers, Inc. 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 Fee Assessment Letter Dear Mr. Jones: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $78,323.40 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Lam Lee Addition No. I Date: 3/9/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) , Water Meter Fee (Domestic) $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permi0 Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $66,398.40 $66,398.40 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project I[ Construction Inspection Fee Information not Available II TOTAL $84,897.20 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $78,323.40 DEVELOPMENT FEE WORKSHEET PROJECT: Lam Cee Addition No. 1 DATE: 3/9/99 Water Impact Fee: Domestic Meter(s): I - 2 inch = 8 ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. $8,325.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: ' Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $192.15 $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrHgation£Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ $192.15 $192.15 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $2,882.25 $5,764.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family @ $0.00 per lot $0.00 0 Multi-family ~} $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $66,398.40 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Avail. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Avail. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Avail. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: lam l~e Addition No. 1 DATE: 3/9/99 ROADWAY IMPACT Servi~ Area * 4 Category ** Industrial Land Use ** General Li~ht Industrial Development Units ** 208.8 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $66,398.4C * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.