Loading...
Lam Lee-CS000214 · Coppell, Texas 75019 The City With A Beautiful Future 972-462-0022 P.O. BOX 478 COPPELL, TEXAS 75019 February 14, 2000 Matt Perry Blue Ridge Construction Co., LTD P.O. Box 488 Blue Ridge, TX 75424-0238 Dear Mr. Petry: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 12, 2000. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a copy of this letter along with your check for $120.00, payable to the City of Coppell to the following address: City of Coppell Finance Deparunent P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely, Construction Inspector cc: Finance Department Debi Ingram, Engineering Secretary FRQM : - FAX NO, : ~ Jun. 19 1999 01:45AM P1 BLUE ~:~ BIDS OONSi'RIIOTION el.. LTII P.o. BOX BLUE RIDGE. TX 75424-02B$ COLLIN phone (972) (972) February 09, 2000 LARRY DAVIS CITY OF COPPELI. FAX: 972-304-3570 RE: LAM LEE PROJECT MR. DAVIS, WE HEREBY REQUEST TO WORK ON THE ABOVE KEFERENCED PROIECT ON FEBRUARY 12, 2000. THANK YOU IN ADVANCE FOR YOU CONSIDERATION. MATT PETRY BLUE RIDGE CONSTRUCTION