Lam Lee-CS000221 Coppell, Texas 75019
~~_~) ~he City With A Beautiful Future 972-462-0022
February 21, 2000
Matt Petry
Blue Ridge Construction Co., LTD
P.O. Box 488
Blue Ridge, TX 75424-0238
RE: Lam Lee Project
Dear Mr: Petry:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, February 19, 2000. The
overtime rate including salary and benefits is $30.00 per hour. Two hours were charged to your
company on that date.
Please send a copy of this letter along with your check for $60.00, payable to the City of Coppell
to the following address:
City of Coppell
Finance Departmem
P.O. Box 478
Coppell, TX 75019
Attention: Jennifer Armstrong, Finance Director
If you should have any questions, please contact me at (972) 304-3679.
Sincerel~~ __----
_Izarry D~.is _ ,. t
construction Inspector
cc: Finance Department
Debi Ingrain, Engineering Secretary
FROM : ,~ FAX NO. : ~ Jun. ~6 1999 01:~AM P1
BLUE niOBE
OONSTIIIIOTION BB.. LTD
P.O. OOX 488
COLLIN
Fax (972)
February 16, 2000
LARRY DAVIS
CITY OF COPPKLL
FAX: 972-304-3S70
RE: LAM LI]E PRO/ECT
MR. DAVIS,
WE HEREBY REQUEST TO WORK ON Tile ABOVE REFERENCED PRO/ECT ON
FEBRUARY 19, 2000. THANK YOU IN ADVANCE FOR YOU CONSIDERATION.
IvlATT PERRY
BLLr~ R/DOE CONSTRUCTION