Loading...
Leonard Estates-CS 971211he City With A Beautiful Future Karen ~mnard ~17 Arbor Brook Coppe~, TX 7~019 RE: Leonard Estates Development Fee Assessment Dear Ms I.~onard: Enclosed is a copy of the City of Coppell Development Fee Assessment table, of the Development Fee calculations for the referenced development. Please make payment to the City of Copper in the amount of $3,490.00 an( Finance Department along with a copy of the Fee Assessment table. This arno of the assessed fees which need to be paid prior to Council approval. Please table for additional fees. Also provide a copy of the Engineer's estimate or co so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help payment of required fees and insure a successful beginning of this project. We to working with you on this project. If you have any questions, please contact Since. rely,/'~ · K , P.E. Director o-f'E'ngineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services P.O. Box 478 Coppell, Texas 75019 214-462-0022 December 11, 1997 long with a copy forward to the ~nt is a portion ~fer to attached ~tract to our office is to verify the look forward ne. DEVELOPMENT FEE TABLE Project: Leonard Estates Date: 12/11/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $24.14 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $24.14 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $450.00 $450.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Park Fee $1,285.00 $1,285.00 (100% due prior to Council Approval) Roadway Impact Fee $855.00 $855.00 (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project N/A Street Sign Fee (100% due prior to Acceptance of Project N/A Construction Inspection Fee Need Submittal of development contracts TOTAL $3,803.28 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,490.00 DEVELOPMENT FEE WORKSHEET PROJECT: Leonord Estotes DATE: 12/11/P7 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - 5/8 inch X 3/4 inch I - 5/8 inch X 3/4 inch Fireline Meter(s): Total #: 2 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to iss~Jance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $24.14 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (h-rigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $24.14 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (AH developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page I ESU's ESU's ESU's ESU's $900.00 $100.00 $24.14 $24.14 $0.00 $0.00 $30.00 $35.00 $450.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of buil~ling permit) * Preliminary plat approved after October 26, 1993: 1 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 N/A N/A N/A N/A $1,285.00 N/A $855.00 NIA N/A Need submittal of development contracts ROADWAY IMPACT FEE CALCULATIONS PROJECT: L~onard Estates DATE: 12/11/97 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x ,Vehicle Miles per Develo~nt Unit) x (Fee per Vehicle ,Mile) -- 2 Sin~e-F~mil~ Nit * (Figure 2 - Roadway Impact ** (Table 3 - Roadway Impact *** (Schedule 2, Page 3 - Road~ ,$855.00 Fee Study) ee Study) ly Impact Fee Study)