Loading...
Lam Lee Add-LR000204 (2)DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: PROJECT: Lam Lee DRILLING CONTRACTOR: REPORT NO.: 00-014.105 REPORT DATE: 02-04-00 WO-1165 WO DATE: 02-03-00 TECHNICIAN_ L.B. Pier Identification i K,6,2 '1 K:7 I K,7.6 I K~8i3 I K,9 ! K-9.7 Date Drilling Started 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 Date Drilling Completed 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 Date Concrete Placed 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 02-03-00 Shaft Diameter (in.) - 30" 30" 30" 30" 30" 30" Bell Diameter (in.) - N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Unknown Unknown Unknown Unknown Unknown Unknown Elevation to Top of Pier (ft.) 514.0' 514.0' 514.0' 514.0' 514.0' 514.0' Depth to Bearing Stratum (ft.) 21.5 24.0' 23.0' 24.0' 24.0' 24.0' Depth of Bottom of Pier (ft.) 27.5 30.0' 30.0" 30.0' 30.0' 30.0' Penetration (ft.) - Required /Actual 6'/6' 6'/6' 6'/7' 6'/6' 6'/6' 6'/6' Length of Pier (ft.) 27.5. 30.0' 30.0' 30.0' 30.0' 30.0' Casing Required: Yes/No Yes~3.6' Yes~24.0' Yes~23.6' Yes~4.0' Yes~23.6' Yes~24.0' Condition of Pier Bottom · Wet/Dry/Clean DRY DRY DRY DRY DRY DRY Plumb within vertical alignment: Yes/No YES YES YES YES YES YES Reinforcing Horizontal Alignment N/A N/A N/A N/A N/A N/A Vertical Bars: No. & Size 4-4f-6 4-~6 4--#6 44f-6 4-#6 4-#6 Horizontal Ties: Size & Spacing #3@12" #3@12" #3@12" #3@12" #3@12" #3@12" Cage Diameter (in.) , 21.5" 21.5" 21.5" 21.5" 21.5" 21.5" Length of Cage (ft.) 26.5' 29.5' 29.5' 29.5' 29.5' 29.5' Vertical Bars Spliced: Yes/No N/A N/A N/A N/A N/A N/A Concrete. Placed with Tremie: Ye~TNo YES YES YES YES YES YES SOILTE ,C~-I ENGINEE~;~4N~,,,~ND ~F:;JSTING,,INC. Jar~e~M. Perdue Materials Testing Manager 2502 Gravel Drive · Fort Worth. Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax