Loading...
WA9302-LR 960116 (08)'EOTECHNICAL GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 16, 1996 Date Concrete Placed: January 4, 1996 Standard 6"x12" CI ent: Natgun Corporation Area 28.27 Square Inches Pr,,ject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 85 Contractor: Natgun Construction Project No.: 95-0258 C~ncrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panel MATERIALS So~r~ h~h W~. INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: 685 Time Sample Batebed: 2:20 pm Cement: Time Sampled: 3:00 pm FI,/Ash: Sample Location: WA-3 Truck/Ticket No: 192/17417 Ccarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 57°F Fine Aggregate: Concrete Range: 60°F Ac mixtures: Slump Range (inches): 6~" Weather Conditions: Partly Cloudy 1 Time Started: 8:30 am 2 Time Completed: 6:00 pm Ac ded Water: 20 gal. Sample Air Content ( % ): 4 % Total Cubic Yards Placed: 60 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Total Load Compressivc Strength Remarks Number Slump (in.) (Days) Tested (Lbs,) (Lbs,/Sq.ln.) UWT 309 63~" 7 01/11/96 125,780 4,450 Slump before super plasticizer was UWT 310 63,~" Hold Hold 11/2" UWT 311 63~" Hold Hold __ Methods Utilized Fracture Regular 5TM C-31,C-39,C-i43 (Unless Noted Otherwise) Cylinders Made By: P.C. Rerlarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea G!~ g Clmsultamts, Inc. Reviewed by.~e ~ur i,rt,,r wrlltc,/api, r,,,al Our letters an~ r~l~,,rts apply only It, Ihc sample tested andA,r inspeeled and are nt>l ,~c~s,arily inciicalivc ,>f Ihc quanli6c~ hi' appare,llly identical ,ir ximihr product~