Loading...
Lam Lee Add-LR000209 (4)DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: PROJECT: Lam Lee DRILLING CONTRACTOR: REPORT NO.: 00-014,108 REPORT DATE: 02-09-00 WO-1201 WO DATE: 02-07-00 TECHNICIAN JPierldentifiCation: J ~5~6 J. A~81t3 J N13 Date Drilling Started 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Date Drilling Completed 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Date Concrete Placed 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Shaft Diameter (in.) - Designed/Measured 36' 36" 36" 30" 36" 36" Bell Diameter (in.) - Designed/Measured No No No No No No Elevation of Pier form Ground Surface (ft.) Unknown Unknown Unknown Unknown Unknown Unknown Elevation to Top of Pier (ft.) 517.0' 517.0' 517.0' 514.0' 517.0' 517.0' Depth to Bearing Stratum (ft.) 25.5' 25.4' 24.3' 24.0' 26.0' 26.0' Depth of Bottom of Pier (ft.) 34.0' 32.0' 30.3' 30.0' 32.0' 32.1' Penetration (ft.)Required-Measure 6'/9.0' 6'/6.6 6'/6.0' 6'/6.0' 6'/6.0' 6'/6.1' Length of Pier (ft.) 34.5' 32.5' 30.8' 30.0' 32.4' 32.5' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom · Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-#6 4-~6 4-#6 4-~6 4-/~6 4-~6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 21.5" 21.5" 21.5" 17" 21.5" 21.5" Length of Cage (ft.) 33.5' 31.5" 29.8" 29.5" 31.5" 31.6" Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Trernie: Yes/No Yes Yes' · Yes Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.: 2 Report No.: 00-014,108 Pier Identification : · Date Drilling Started 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Date Drilling Completed 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Date Concrete Placed 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 02-07-00 Shaft Diameter (in.) - 36 36 36 36 36 36 Bell Diameter (in.) - N/A N/A N/A N/A N/A N/A Elevation of Pierform Ground Surface Unknown Unknown Unknown Unknown Unknown Unknow Depth to Top of Pier (ft.) 517.0' 517.0' 517.0' 517.0' 517.0' 517.0' Depth to Bearing Stratum (ft.) 24.3' 25.0' 26.0' 26.2' 26.0' 28.5' Depth of Bottom of Pier (ft.) 31.4' 31.9' 32.1' 32.5' 32.0' 36.5' Penetration (ft.) - Required/Measured 6'/7.1' 6/6.9' 6/6.1' 6'/6.3' 6'/6.0' 6'/6.0' Length of Pier (ft.) 31.8' 32.3' 32.5 32.9' 32.4' 36.9' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-@6 4-@6 4-@6 4-@6 4-@6 4-@6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 21.5" 21.5" 21.5" 21.5" 21.5" 21.5" Length of Cage (ft.) 30.9' 31.4' 31.6' 32.0' 31.5' 36.0' Vertical Bars Spliced: Yes/No Yes Yes Yes Yes Yes Yes Concrete Placed with Tremie: Yes/No Yes Yes Yes Yes Yes Y 2502 Gravel Drive · Fort Worth, Texas 78118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.:3 Report No.:00-014.108 Ipier Identification ~ A/8 3 I ~7 I Date Drilling Started 02-07-00 02-07-00 02-07-00 02-07-00 Date Drilling Completed 02-07-00 02-07-00 02-07-00 02-07-00 Date Concrete Placed 02-07-00 02-07-00 02-07-00 02-07-00 Shaft Diameter (in.) - Designed/Measured 36" 36" 36" 36" Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) Unknown Unknown Unknown Unknown Depth to Top of Pier (ft.) 517.0 517.0 517.0 517.0 Depth to Bearing Stratum (ft.) 26.1' 23.6' 26.3' 26.0' Depth of Bottom of Pier (ft.) 32.3' 32.7' 32.7' 32.2' Penetration (ff.) - Required/Measured 6.0'/6.2' 6.0'/9.1' 6.0?6.4' 6.0'~6.2' Length of Pier (ft.) 32.7' 33.1' 33.1' 32.6' Casing Required: Yes/No No No No No Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No Vertical Bars: No. & Size 4-~6 4-#6 44/~ 4-#6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 21" 21" 21" 21" Length of Cage (ft.) 31.8' 32.2' 32.2' 31.7' Vertical Bars Spliced: Yes/No No No No No Concrete Placed with Tremie: Yes/No Yes Yes Yes Yes SOIL~ECH~ENGI~~ TES~I,NG, INC. ,"'"----" i';- ~./-:"t-..~,~ ~ ~ I '"" ~,~.--~.,,~ ~, Ja~es M. Perdue ~struction Material Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone ° 817.589.7279 metro ° 817.595.0708 fax