Loading...
Lam Lee Add-LR000209 (5) DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: PROJECT: Lam Lee DRILLING CONTRACTOR: REPORT NO.: 00-014.110 REPORT DATE: 02-09-00 W0-1220 WO DATE: 02-08-00 TECHNICIAN Date Drilling Started 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Date Drilling Completed 02-08.00 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Date Concrete Placed 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Shaft Diameter (in.) - Designed/Measured 36" 36" 36" 36" 36" 36" Bell Diameter (in.)- Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Sur[ace (ft.) Unknown Unknown Unknown Unknown Unknown Unknow Elevation to Top of Pier (ft.) 517.0' 517.0' 517.0' 517.0' 517.0' 517.0' Depth to Bearing Stratum (ft.) 30.0' 30.0' 30.0' 25.5' 25.0' 26.0' Depth of Bottom of Pier (ft.) 36.0' 36.0' 36.0' 28.0' 27.0' 28.0' Penetration (ft.) - Required/Measured 6.0'/6.0' 6.0'/6.0' 6.0'/6.0' 2.0'/2.5' 2.0'/2.5' 2.0'/2.0' Length of Pier (ft.) 36.4' 36.4' 36.4' 28.0' 27.0' 28.0' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment N/A N/A N/A N/A N/A N/A Vertical Bars: No. & Size 44f.6 4-#6 44f.6 44¢6 44¢6 44f.6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 21" 21" 21" 13" 13" 13" Length of Cage (ff.) 35.5' 35.5' 35.5' 30.0' 29.0' 30.0' Vertical Bars Spliced: Yes/No Yes Yes Yes No No No Concrete Placed with Tremie: Yes/No Ye~ Yes' Yes Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817,589.7279 metro · 817,595.0708 fax Page No.: 2 Report No.: 00-014.110 Date Drilling Started 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Date Drilling Completed 02-08-0O 02-08-00 O2-08-00 O2-08-0O 02-08-OO 02-08-00 Date Concrete Placed 02-08-00 02-08-00 O2-08-00 02-O8-00 02-08-00 02-08-OO Shaft Diameter (in.) - 24" 24" 24" 24" 24" 24" Bell Diameter (in.) - N/A N/A N/A N/A N/A N/A Elevation of Pierform Ground Surface Unknown Unknown Unknown Unknown Unknown Unknow Depth to Top of Pier (ft.) 513.0' 513.0' 513.0' 513.0' 513,0' 513.0' Depth to Bearing Stratum (ft.) 27.0' 26.0' 26.0' 26.0' 26.0' 27.5' Depth of Bottom of Pier (ft.) 29.6' 28.0' 28.5' 28.0' 28.0' 29.7' Penetration (ft.) - Designed/Measured 2.0'/2.3' 2.0'/2.0' 2.0'/2.5' 2.0'/2.0' 2.0'/2.0' 2.0'/2.2' Length of Pier (ft.) 29.3' 28.0' 28.5' 28.0' 28.0' 29.7' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment N/A N/A N/A N/A N/A N/A Vertical Bars: No. & Size 4.4f.6 4-#6 4-~6 4-#6 4-~6 4-~6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 13" 13" 13" 13" 13" 13" Length of Cage (ft.) 32' 32' 32' 32' 32' 32' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Trem'ie: Yes/No Yes y~ y~ Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No,:3 Report No.:00-014.110 Date Drilling Started 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Date Drilling Completed 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Date Concrete Placed 02-08-00 02-08-00 02-08-00 02-08-00 02-08-00 Shaft Diameter (in.) - Designed/Measured 24" 24" 24" 24" 24" Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) Unknown Unknown Unknown Unknown Unknown Depth to Top of Pier (ft.) 513.0' 513.0' 513.0' 513.0' 513.0' Depth to Bearing Stratum (ft.) 25.7' 25.0' 25.5' 26.0' 26.5' Depth of Bottom of Pier (ft.) 28.0' 27.3' 28.4' 28.2' 29.4' Penetration (ft.) - Designed/Measured 2.0'/2.3' 2.0'/2.3' 2.0'/2.9' 2.0'/2.2' 2.0'/2.9' Length of Pier (ft.) 28.0' 27.3' 28.4' 28.2' 29.4' Casing Required: Yes/No Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment N/A N/A N/A N/A N/A Vertical Bars: No. & Size 44¢6 4-~6 44~6 4-#6 44t6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 13" 13" 13" 13" 13" Length of Cage (ft.) 30' 29.3' 30.4' 30.2' 32.4' Vertical Bars Spliced: Yes/No No No No No No Concrete Placed with Tremie: .Yes/No Yes Yes Yes Yes Yes ,,c. Jar~es'rVI. Pe~'due 'k,~,~nstruction Material Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595,0708 fax