Loading...
Lam Lee Add-LR000209 (7)DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: Gray Shale PROJECT: Lam Lee DRILLING CONTRACTOR: D.D. Denman REPORT NO.: 00-014.109R REPORT DATE: 02-09-00 WO-1201 WO DATE: 02-05-00 TECHNICIAN T. Smith~ Pier Identification t G7t3 I F~5/13 I F;I;i13 I Ei5113 ! E/13 Date Ddllin~ Started 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 Date Drilling Completed 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 Date Concrete Placed 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 02-05-99 Shaft Diameter (in.) - Desi!]ned/Ueasured 36'/36' 36'~36' 36'~36' 36'/36' 36'~36' 36'/36' Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) Unknown Unknown Unknown Unknown Unknown Unknown Elevation to Top of Pier (ft.) 517.0' 517.0' 517.0' 517.0' 517.0' 517.0' Depth to Bearing Stratum (ft.) 26.5' 27.1' 27.6' 26.0' 26.9' 27.2' Depth of Bottom of Pier (ft.) 33.5' 33.3' 35.2' 33.2' 33.7' 34.5' Penetration (ft) - Required/Measures 6?7.0' 6'/6.2' 6?7.6' 6'/7.2' 6?6.8' 6~'7.3' Length of Pier (ft.) 34.5' 33.3' 35.3' 33.2' 33.7' 35.0' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment Yes Yes Yes Yes Yes Yes Vertical Bars: No. & Size 4-#6 4.4~ 4-#6 4-#6 4-#6 44f.6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 34.0" 33.0" 35.0" 32.7" 33.2" 34.5" Length of Cage (ft.) No No No No No No Vertical Bars Spliced: Yes/No Yes Yes . Yes Yes Yes Yes Concrete Placed with Tremie: Yes/No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.: 2 Report No.: 00-014.109 pie:r identification Date Drilling Started 02-05-00 02-05-00 Date Drilling Completed 02-05-00 02-05-00 Date Concrete Placed 02-05-00 02-05-00 Shaft Diameter (in.) - Designed/Measured 36" 36" Bell Diameter (in.) - Designed/Measured N/A N/A Elevation of Pier form Ground Surface (ft.) Unknown Unknown Depth to Top of Pier (ft.) 517.0' 517.0' Depth to Bearing Stratum (ft.) 26.7' 26.0' Depth of Bottom of Pier (ft.) 34.2' 33.7' Penetration (ft.) - Designed/Measured 6.0'/7.5' 6.0/7.7' Length of Pier (ft.) 34.7' 34.2' Casing Required: Yes/No Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Reinforcing Horizontal Alignment Yes Yes Vertical Bars: No. & Size 44/8 44¢6 Horizontal Ties: Size & Spacing #3@12 #3@12 Cage Diameter (in.) 21.5" 21.5" Length of Cage (ft.) 34.2' 33.7' Vertical Bars Spliced: Yes/No No No Concrete Placed with Trem~e: Yes/No Yes Y~ SOILTECH ENGINEERII)(~ TESTING, INC. ~lCvlaterials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax