Loading...
WA9302-LR 960116 (09)"EOTECHNICAL ' E GEE Consultants, Inc. E NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 16, 1996 Date Concrete Placed: January 4, 1996 Standard 6"x12" CI eat: Natgun Corporation Area 28.27 Square Inches Prt,ject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 84 Contractor: Natgun Construction Project No.: 95-0258 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Wall Panels MATERIALS s ...../ .a~ch w~. INSPECTION DATA Desc riplion (Lbs./Cu. Yd) M x Number: 685 Time Sample Batched: 1:10 pm Cement: Time Sampled: 1:45 pm FI,., Ash: Sample Location: WB-2 Truck/Ticket No: 161/17405 Ccarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 56°F Film Aggregate: Concrete Range: 64°F At mixtures: Slump Range (inches): 4" Weather Conditions: Partly Cloudy 1 Time Started: 8:30 am 2 Time Completed: 6:00 pm Acded Water: 35 gal. Sample Air Content (%): 3% Total Cubic Yards Placed: 50 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specnnen Measured Age Date Total Load Compresslye Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) 2WT 306 4" 7 01/11/96 110,740 3,920 Slump before super plasticizer was 3" 2WT 307 4" Hold Hold 2WT 308 4" Hold Hold :st Methods Utilized Fracture Regular iTM C-3t ,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P.C. __ ReI:/art:s and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GEE (:rosalain/s, lm:. Reviewed by~ ~