Loading...
Lam Lee Add-LR000210 (3)SOIL vlOISTURE - DENSITY TEST RE 'ORT IN - PLACE TESTS BY NUCLEAR METHODS CLIENT: Scott And Reed Contractors WORK DATE: 02-10-00 PROJECT: Lam Lee REPORT NO,: 00-014.115 No.: 00-1212 SPECIFICATIONS TEST DATA ' Percent Compaction: 95% Date Tested: 02-08-00 Moisture Content (%): Technician: R. Burtsell MATER~L :REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIPTION MAX. DRY OPTIMUM NO. METHOD DENSITY (pc'f) MOISTURE (%) 1 D698 Red Brown Sandy Clay with gravel 121.2 10.4 IN~PI~CE TEST RESULTS DENSITY AND MOISTURE TESTSARE pER ASTM D2922,. DG017i RESPECTiVELy DRY MOISTURE % OF MAX. TEST LIFT OR LOCATION REF. DENSITY NO. ELEVATION CURVE (pcf) (%) DRY DENSITY 1 l't Lift East side center of building pad 1 118.4 12.1 98 2 1 =t Lift East side center of building pad - 30' south 1 115.4 11.5 95 3 1" Lift East side center of building pad - 60' south 1 118.2 12.4 98 4 l't Lift East side center of building pad - 90' south 1 119.9 12.1 99 5 1" Lift South east corner of building pad 1 118.9 13.2 98 6 1" Lift South east corner of building pad - 25' west 1 116.3 11.0 96 7 1" Lift South east corner of building pad - 25' north 1 118.6 12,5 98 8 1st Lift South east corner of building pad - 100' north 1 115.6 11.6 95 0 1 ,t Lift North east corner of office area - 50' north I 115.9 13.7 96 ! 0 1 '~ Lift North east corner of office area - 150' north 1 116.6 13.5 96 11 1st Lift I North east corner of office area -150' north - 25' west 1 117.9 12.8 97 12 1" Lift North east corner of office area 1 115.9 13.1 96 13 1s' Lift South east corner of office area 1 118.4 10.1 98 14 lS~ Lift South side - center of office area 1 115.2 13.2 95 15 1 ,t Lift South side - center of office area 70' west I 115.1 13.0 95 16 1 ,t Lift South west corner of office area 1 118.7 11.4 98 17 1't Lift South west corner of office area - 25' north 1 117.3 11.6 97 18 1" Lift South west corner of office area - 100' north 1 117.8 11.5 97 19 1 '' Lift West side (;enter of building pad I 118.4 12.8 98 20 1 't Lift West side center of building pad - 50' east 1 119.1 13.2 98 21 1st Lift Center of building pad - 5' south 1 118.2 12.9 98 22 1'~ Lift Center of building pad - 30' east I 115.1 12.6 95 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2450' STD. MOISTURE COUNT: 118 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. Manager