Loading...
WA9302-LR 960116 (10)['EOTECHN ICAL ~ E I GEE Consultants, Inc. E NVIRONMENTAL 2540 Glenda Lane · Suite 108 , Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 16, 1996 Date Concrete Placed: January 4, 1996 Standard 6"x12" CI ent: Natgun Corporation Area 28.27 Square Inches Pr,,ject: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 83 Co ntractor: Natgun Construction Project No.: 95 -0258 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS source; ~a~, w~. INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: 685 Time Sample Batched: 12:45 pm Cement: Time Sampled: 1:20 pm FI,, Ash: Sample Location: 5D-3, 4D-3, 5E-3, 6E-3, 6F-3 Truck/Ticket No: 170/17395 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 55°F Fine Aggregate: Concrete Range: 56°F Ac mixtures: Slump Range (inches): 9" Weather Conditions: Partly Cloudy 1 Time Started: 8:30 am 2 Time Completed: 6:00 pm Acded Water: Sample Air Content (%): 4% Total Cubic Yards Placed: 40 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Tolal Load Compresslye Strength Remarks Nmnber Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) UWT 303 9" 7 01/11/96 128,160 4,530 Slump before super plasticizer was ~WT 304 9" Hold Hold 3 ~" UWT 305 9" Hold Hold :st Methods Utilized Fracture Regular STM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P.C. Rer tarks and/or Distribution: Note: Slumb before super plasticizer was 21/2'' cc: Mr. Larry Davis - City of Coppoll Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GEg Cmsmlhmts, lmz. Reviewed