Lam Lee Add-LR000216 (03)~-. ~ DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: Gray Shale PROJECT: Lam Lee DRILLING CONTRACTOR: D.D. Denman REPORT NO.: 00-014.127 REPORT DATE: 02-16-00 WO-1274 WO DATE: 02-15-00 TECHNICIAN' D. Rogers Date Drilling Started 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Drilling Completed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Concrete Placed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Shaft Diameter (in.) - Designed/Measured 30" 30' 30" 30" 30" 30" Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A N/A Elevation to Top of Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 30.0' 29.2' 29.0' 30.0' 29.0' 29.4' Depth of Bottom of Pier (ft.) 32.1' 31.4' 32.0' 32.1' 31.2' 31.1 Penetration (ft.) -Required/Measured 2.0'/2.1' 2.0'~2.2' 2.0'~3.0' 2.0'/2.1' 2.0~'2.2' 2.0'/2.1' Length of Pier (ft.) 31.7' 30.8' 31.5' 31.6' 30.6' 30.6' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom · Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-~6 4-~ 4-~6 4-~6 4-.#6 44f-6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) , 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 31.2 30.3 31.0 31.1 30.1 30.1 Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.: 2 Report No.: 00-014.127 Date Drilling Started 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Drilling Completed 02-15-00 02-15-00 02-15-00 02-15-O0 02-15-00 02-15°OO Date Concrete Placed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Shaft Diameter (in.) - 30" 30" 30" 30" 30" 30" Bell Diameter (in.) - N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface N/A N/A N/A N/A N/A N/A Depth to Top of Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 29.0' 33.5' 30.0' 29.5 30.2' 29.0' Depth of Bottom of Pier (ft,) 31.4' 30..4 33.0' 31.8' 33.5' 31,2' Penetration (ft.)Required/Measured 2.0'/2.4' 2.0'/3.1' 2.0'/3.0' 2.0'/2.3' 2,0'/3.3' 2.0'/2.2' Length of Pier (ft.) 30.9' 29.9' 32.5' 31.0' 33.0' 30.8' Casing Required: Yes/No No No No No No No Condition of Pier Bottom: Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-#6 44¢6 4-#6 4-~6 4.4¢6 4-~6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Lenoth of Ca(~e (ft.~ ;~0,4 30.4 30.4 30.4 30,4 30.4 Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817,589.7279 metro ° 817.595.0708 fax Page No.:3 Report No. :00-014.127 ; , Date Drilling Started 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Drilling Completed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Concrete Placed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Shaft Diameter (in.) - Designed/Measured 30' 30' 30' 30' 30' 30' Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A N/A Depth to Top of Pier (ft.) 518.0 518.0 518.0 518.0 518.0 518.0 Depth to Bearing Stratum (ft.) 28.0' 29.0' 28.1' 29.5' 29.3' 30.2' Depth of Bottom of Pier (ft.) 30.2' 31.7' 30.2' 31.9' 31.0' 32.4' Penetration (ft.) -Required/Measured 2.0'/2.2' 2.0'/2.7' 2.0'/2.2' 2.0'/2.4' 2.0'/2.3' 2,0'/2,4' Length of Pier (ft.) 29.7' 31.2' 29.7' 31.3' 31.0' 31.9' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 44f.6 441~6 4-.~ 4-4f-6 44f-6 44f-6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 29.2' 30.7' 29.2' 31.0' 30.5' 31.4' Vertical Bars Spliced: Yes/No No No No No No No (;oncrete Placed with Trernie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page 4 00-014.127 Pier ,dentificaiion :: J I J J'i D,2 J Date Drilling Started 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Drilling Completed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Date Concrete Placed 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 02-15-00 Shaft Diameter (in.) - Designed/Measured 30" 30" 30" 30" 30" 30" Bell Diameter (in.) - Designed/Measured N/A, N/A, N/A, N/A, N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A, N/A Depth to Top of Pier (ff.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 30.1. 29.4 30.4 30.0 30.2 29.5 Depth of Bottom of Pier (ft.) 33.3' 31.8' 33.0' 32.5' 33.3' 31.7' Penetration (ft.) - Required/Measured 2.0'/3.2' 2.0'/2.4' 2.0'/2.6' 2.0'/2.5' 2.0'/3.1' 2.0'/2.2' Length of Pier (ft.) 32.8' 31.3' 32.5' 32.0' 32.8' 31.2' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal A,lignment No No No No No No Vertical Bars: No. & Size 4-~6 4-/f~ 4-#6 4-,'~ 4-#6 4-#6 Horizontal Ties: Size & Spacing #3@!2 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 32.3' 31.0' 32.0' 31.5' 32.3' 30.8' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page 5 00-014.127 Pier Identification I Fl2 Date Drilling Started 02-15-00 02-15-00 Date Drilling Completed 02-15-00 02-15-00 Date Concrete Placed 02-15-00 02-15-00 Shaft Diameter (in.) - Designed/Measured 30" 30" Bell Diameter (in.) - Designed/Measured N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A Depth to Top of Pier (ft.) 518.0' 518.0' Depth to Bearing Stratum (ft.) 30.2' 28.0 Depth of Bottom of Pier (ft.) 32.2' 30.9 Penetration (ft.) - Required/Measured 2.0'~2.5' 2.0~2.9 Length of Pier (ft.) 32.2' 30.4' Casing Required: Yes/No Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Reinforcing Horizontal Alignment N/A N/A Vertical Bars: No. & Size 4-#6 4-#6 Horizontal Ties: Size & Spacing #3@12 #3@12 Cage Diameter (in.) 17" 17" Length of Cage (ft.) 31.7' 30.0' Vertical Bars Spliced: Yes/No No No Concrete Placed with Tremie: Yes/No No No SOILTE,(~, ENGINEE~JJ:~ TEStinG, INC, /' .... ./ //7 JAIV'tES M. PERDUE MATERIALS TESTING MANAGER 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax