Loading...
Lam Lee Add-LR000216 (06)CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Scott Reed Contractors REPORT DATE: 02-16-00 PROJECT: Lam Lee REPORT NO.: 00-014.131 WO: 1219 Technician: TJ · SPECiFiCATiONs PROJECT DATA i ~ Strength (psi): 3000 PSI Date of Placement: 02-08-00 Slump (in.): 5" Sampled By: T Jackson Air Content (%): Weather: Cool & Partly Cloudy Concrete Temp (°F): Supplier/Mix: Pioneer : · :. :: , EtELD DATAffl Ticket #: 440733 Time Batched: 9:54 AM Time Sampled: 10:36 AM Slump (in.): 6" Air Content (%): N/A Unit Weight (pcf): N/A Concrete Temp (°F): 58° Air Temp (°F): 65° Yardage (cu.yd.): 30 Location/Remarks: Piers - # 43 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 1-1 02-15 7 90000 3180 1 1-2 03-05 28 Set 1-3 03-05 28 1-4 Hold Hold FIELD: DATA #2 Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content (%): Unit Weight (pcf): Concrete Temp (°F): Air Temp (°F): Yardage (cu.yd.): Location/Remarks: SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED IdaTsl libel {psiI 2-1 2 2-2 Set 2-3 2-4 ~OMINAL CYLINDER ~51ZE: 6 X 12. ~REA: 28.27 SCl. in. UN _E$,.~ NOTED HEI~E: TYPE "A" CONE I-RACTURE UNLES~ INDICATED OTHEI~WISE IN NOTE,'5. TEST RESULTS COMPLY WITH PROJECT S13E( UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOtLTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C31, TESTED PER ASTM C39 Soiltech Engineering And Testing, inc. James M. Perdue Materials Testing Manager 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax