Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Lam Lee Add-LR000216 (07)
DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: Gray Shale PROJECT: Lam Lee DRILLING CONTRACTOR: D, D, Denman REPORT NO.: 00-014.130 REPORT DATE: 02-16-00 W0-1267 WO DATE: 02-14-00 TECHNICIAN_ D. Rogers I Pier identification Date Drilling Started 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Drilling Completed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Concrete Placed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Shaft Diameter (in.)- Designed/Measured 30" 30' 30" 30" 30" 30" Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A N/A Elevation to Top of Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 29.0' 28.5' 28.0' 28.0' 28.5' 27.6' Depth of Bottom of Pier (ft.) 31.4' 31.0' 30.5' 30.2' 30.9' 29.5 Penetration (ft.) -Required/Measured 2.0'/2.4' 2.0'/2.5' 2.0'/2.5' 2.0'/2.2' 2.0/'2.4' 2.0?2.5' Length of Pier (ft.) 27.4' 28.0' 28.5' 27.2' 27.8' 26.5' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-#6 44¢6 44¢6 44t6 4-~6 44f-6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 30.4 30.0 29.5 28.9 29.0 28.0 Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone ° 817.589.7279 metro · 817.595.0708 fax Page No.: 2 Report No.: 00-014.130 Date Drilling Started 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Drilling Completed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Concrete Placed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Shaft Diameter (in.) - 30" 30" 30" 30" 30" 30" Bell Diameter (in.) - No No No No No No Elevation of Pier form Ground Surface N/A N/A N/A N/A N/A N/A Depth to Top of Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 29.0' 28.2' 28.0' 28.0' 28.1' 29.5' Depth of Bottom of Pier (ft.) 31.0' 30.2' 30.0' 30.2' 30.2' 31.5' Penetration (ft.)Required/Measured 2.0'/2.0' 2.0'/2.0' 2.0'/2.0' 2.0'/2.2' 2.0'/2.1' 2.0'/2.1' Length of Pier (ft.) 28.0' 27.2' 27.0' 27.2' 27.2' 28.5' Casing Required: Yes/No No No No No No No Condition of Pier Bottom: Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 44f.6 44¢6 4-#6 4-~6 4-~6 44f.6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 29.5' 28.9' 29.5' 28.6' 28.6' 29.9' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.:3 Report No.:00-014.130 I Pier Identification I : Fi6 IGl6 I H/6 G~8 Date Drilling Started 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Drilling Completed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Concrete Placed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Shaft Diameter (in.) - Designed/Measured 30' 30' 30' 30' 30' 30' Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A NIA N/A NIA Depth to Top of Pier (ft.) 518.0 518.0 518.0 518.0 518.0 518.0 Depth to Bearing Stratum (ft.) 29.1' 29.2' 28.5' 27.7' 29.0' 29.0' Depth of Bottom of Pier (ft.) 31.2' 31.4' 31.0' 29.9' 31.8' 31.3' Penetration (ft.) -Required/Measured 2.0'/2.1' 2.0'~2.2' 2.0'~2.5' 2.0'/2.2' 2.0'~2.8' 2.0'~2.3' Length of Pier (ft.) 30.7' 30,9' 30.5' 29.2' 30.3' 30.8' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 44~6 44¢6 44~6 44~6 44~6 4-#6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft,) 30.2' 30.3' 30.0' 29.0' 30.0' 30.3' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page 4 00-014.130 Date Drilling Started 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Drilling Completed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Date Concrete Placed 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 02-14-00 Shaft Diameter (in.) - Designed/Measured 30" 30" 30" 30" 30" 30" Bell Diameter (in.) - Designed/Measured N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A N/A Depth to Top of: Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 29,5' 28.0' 30,0' 28.0' 29.2' 28.2' Depth of Bottom of Pier (ft.) 32.0' 30.9' 32.7' 30.5' 31.5' 30.4' Penetration (ft.) - Required/Measured 2.0'/2.5' 2.0'/2.9' 2.0'/2.7' 2.0'/2.5' 2.0'/2.3' 2.0'/2.4' Length of Pier (ft.) 31.5' 30.4' 32.3' 30.0' 31.0' 30.3' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes/No Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-#6 4-~6 4-#6 4-~6 4-~ 44t~6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 31.0' 30.0' 32.0' 29.5' 30.5' 29.5' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No No No No No No No 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page 5 00-014.130 Pier Identification ~ Date Ddlling Started 02-14-00 Date Drilling Completed 02-14-00 Date Concrete Placed 02-14-00 Shaft Diameter (in.) - Designed/Measured 30" Bell Diameter (in.) - Designed/Measured N/A Elevation of Pier form Ground Surface (ft.) N/A Depth to Top of Pier (ft.) 518.0' Depth to Bearing Stratum (ft.) 30.0' Depth of Bottom of Pier (ft.) 32.2' Penetration (ft.) - Required/Measured 2.0'~2.2' Length of Pier (ft.) 31.7' Casing Required: Yes/No Yes Condition of Pier Bottom: Wet/Dry/Clean Dry Plumb within vertical alignment: Yes/No Yes Reinforcing Horizontal Alignment N/A Vertical Bars: No. & Size 44~6 Horizontal Ties: Size & Spacing #3@12 Cage Diameter (in.) 17" Length of Cage (ft.) 31.2' Vertical Bars Spliced: Yes/No No Concret~ Pla~ed with Tremie: Ye~No No SOILTEC~ ENGINEERIN~ TEST~, INC, JAML~S M. PERDUE MATERIALS TESTING MANAGER 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax