Loading...
Lam Lee Add-LR000216 (09), DRILLED PIER INSPECTION REPORT CLIENT: Scott Reed Contractors BEARING STRATUM: Gray Shale PROJECT: Lam Lee DRILLING CONTRACTOR: D.D. Denman REPORT NO.: 00-014.128 REPORT DATE: 02-16-00 WO-1262 WO DATE: 02-12-00 TECHNICIAN T.Jackson pier identification C/11 D/10 I I D/7 Date Ddlling Started 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Date Drilling Completed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Date Concrete Placed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Shaft Diameter (in.)- Designed/Measured 30" 30' 30" 30" 30" 30" Bell Diameter (in.)- Designed/Measured No No No No No No Elevation of Pier form Ground Surface (ft.) N/A N/A N/A N/A N/A N/A Elevation to Top of Pier (ft.) 518.0' 518.0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 28.0' 27.0' 28,0' 28.0' 28.0' 28.0' Depth of Bottom of Pier (ft.) 31.1' 32.0' 30.1' 30.7' 30.1' 30,8' Penetration (ft.) -Required/Measured 2.0'/3.1' 2.0'/5.0' 2.0'/2.1' 2.0'/2.7' 2.0/'2.1' 2.0?2.8' Length of Pier (ft.) 30.6' 32.0' 29.6' 30.2' 29.6' 30.3' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom · Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 4-~6 44t6 4-#6 4-~6 4-#6 4-~6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ff.) 30.0' 31.5 29.0' 29.7' 29.0' 29.7' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No Yes Yes Yes Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.: 2 Report No.: 00-014.128 Date Drilling Started 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Date Drilling Completed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Date Concrete Placed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Shaft Diameter (in.) - 30" 30" 30" 30" 30" Bell Diameter (in.) - No No No No No Elevation of Pier form Ground Surface N/A N/A N/A N/A N/A Depth to Top of Pier (ft,) 518,0' 518.0' 518.0' 518.0' 518.0' Depth to Bearing Stratum (ft.) 29.0' 29.0' 29.0' 28.0' 28.0' Depth of Bottom of Pier (ft.) 31.2' 31,7' 31.9' 30.7' 31.1' Penetration (ft.)Required/Measured 2.0'/2.2' 2.0'/2.7' 2.0'/2.9' 2.0'/2.7' 2.0'/3.1' Length of Pier (ft.) 31.2' 31.7' 31.9' 30.7' 31.1' Casing Required: Yes/No Yes Yes Yes Yes Yes Condition of Pier Bottom: Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No Vertical Bars: No. & Size 4-#6 4-~6 4-#6 4-~6 4-#6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" Length of Cage (ft.) 30.7' 31.2' 31.4' 30.2' 30.6' Vertical Bars Spliced: Yes/No No No No No No Concrete Placed with Trernie: Yes/No Yes Yes Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page No.:3 ' Repo'rt No. :00-014.128 Pier Identificati°n C~8 B/8 :C/9: C~iO B/10 Date Drilling Started 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-OO Date Drilling Completed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Date Concrete Placed 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 02-12-00 Shaft Diameter (in.) - 30' 30' 30' 30' 30' 30' Bell Diameter (in.) - N/A N/A N/A N/A N/A N/A Elevation of Pier form Ground Surface N/A N/A N/A N/A N/A N/A Depth to TOD of Pier ('ft.~ 518.0 518.0 518.0 518.0 518.0 518.0 Depth to Bearing Stratum (ft.) 27.5' 30.0' 28.5' 30.0' 28.0' 29.0' Depth of Bottom of Pier (ft.) 31.0' 32.4' 30.5' 32.5' 30.4' 31.0' Penetration (ft.) -Required/Measured 2.0'/3.5 2.0/2.4 2.0/2.0 2.0/2.5 2.0/2.4 2.0/2.0 Length of Pier (ft.) 31.0' 32.4' 30.5' 32.5' 30.4' 31.0' Casing Required: Yes/No Yes Yes Yes Yes Yes Yes Condition of Pier Bottom · Dry Dry Dry Dry Dry Dry Plumb within vertical alignment: Yes Yes Yes Yes Yes Yes Reinforcing Horizontal Alignment No No No No No No Vertical Bars: No. & Size 44¢6 4-#6 4-~6 4-#6 4-#6 44¢6 Horizontal Ties: Size & Spacing #3@12 #3@12 #3@12 #3@12 #3@12 #3@12 Cage Diameter (in.) 17" 17" 17" 17" 17" 17" Length of Cage (ft.) 30.5' 31.9' 30.0' 32,0' 29.9' 30.5' Vertical Bars Spliced: Yes/No No No No No No No Concrete Placed with Tremie: Yes/No Yes Yes Yes Yes Yes Yes 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax Page4 00-01'4.128 Pier Identificati°n Date Drilling Started 02-12-00 Date Drilling Completed 02-12-00 Date Concrete Placed 02-12-00 'Shaft Diameter (in.) - 30" Bell Diameter (in.) - N/A Elevation of Pier form Ground Surface N/A Depth to Top of Pier (ft.) 518.0' Depth to Bearing Stratum (ft.) 31.0' Depth of Bottom of Pier (ft.) 33.6 Penetration (ft.) - Required/Measured 2.0'/2.6' Length of Pier (ft.) 33.0' Casing Required: Yes/No Yes Condition of Pier Bottom: Dry Plumb within vertical alignment: Yes Reinforcing Horizontal Alignment No Vertical Bars: No. & Size Horizontal Ties: Size & Spacing #3@12 Cage Diameter (in.) 17" Length of Cage (ft.) 32.5' Vertical Bars Spliced: Yes/No No Concrete Placed with Tremi~ Yes/No Yes SOIL'g'E_CH ENGINEE.,Ri~IG/~STIN~, lNG, JAMES M. PERDUE MATERIALS TESTING MANAGER 2502 Gravel Drive · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817,595,0708 fax