Loading...
WA9302-LR 960116 (11)[EOTECH N ICAL E I GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 16, 1996 Date Concrete Placed: January 4, 1996 Standard 6"x12" CI ent: Natgun Corporation Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 82 Contractor: Natgun Construction Project No.: 95-0258 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Dome Panels MATERIALS S~rce/ Batch W~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 685 Time Sample Batched: 11:00 am Cement: Time Sampled: 12:30 am FI,.' Ash: Sample Location: 3C-3, 6C-3, 4C-3, 5C-3, 6D-3 Truck/Ticket No: 107/17387 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 55°F Fine Aggregate: Concrete Range: 59°F Ac mixtures: Slump Range (inches): 5 V2" Weather Conditions: Partly Cloudy 1 Time Started: 8:30 am 2 Time Completed: 6:00 pm Ac ded Water: 25 gal. Sample Air Content ( % ): 4 % Total Cubic Yards Placed: 30 C.Y. Required Strength (Lbs./sq.in.): 5,000 psi Specimen Measured Age Date Tohal Load Compressivc Strength Remarks Number Slump (h~.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) ~WT 300 5 V2" 7 01 / 11/96 119,860 4,240 Slump before super plasticizer was UWT 301 5Vz" Hold Hold 3V2" ~WT 302 5 V2" Hold Hold :st Methods Utilized Fracture Regular ~TM C 31,C 39,C 143 (Unless Noted Otherwise) Cylinders Made By: P.C. Ret:larks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GEE {:mssul~ss~, ~ Reviewed