Loading...
Lam Lee Add-LR000222CONCRETE IN..,PECTION AND COMPRESSIOI-,,~, EST REPORT CLIENT: Alice Lee C/O Reality Capital REPORT DATE: 02-22-00 PROJECT: Lam Lee REPORT NO.: 00-014.136 WO: 1248 Technician: T. J SPECIFICATIONS PROjECT DATA Strength (psi): 3000 (~ 28 days Date of Placement: 02-10-00 Slump (in.): 5" Sampled By: T Jackson Air Content (%): Weather: Cool and Partly cloudy Concrete Temp (°F): Supplier/Mix: Pioneer · FIELD DATA #t Ticket #: 440878 Time Batched: 10:23 AM Time Sampled: 11:30AM Slump (in.): 5.5" Air Content (%): Unit Weight (pcf): Concrete Temp (°F): 60° Air Temp (°F): 68° Yardage (cu.yd.): 40 Location/Remarks: Piers - A/2.2 SET CYLINDER DATE AGE MAX. LOAD STRENGTH NOTES NO. NO. TESTED (days) (lbs) (psi) 1-1 02-17 7 91000 3220 I 1-2 03-09 28 Set 1-3 3-09 28 1-4 Hold Hold : FfELD DATA ~r~ : Ticket #: Time Batched: Time Sampled: Slump (in.): Air Content (%): : Unit Weight (pcf): Concrete Temp (°F): Air Temp (°F): Yardage (cu.yd.): Location/Remarks: SET CYLINDER DATE AGE MAX. LOAD I STRENGTH NOTES · NO. NO. TESTED /da~'sl IlbslI Ipsi/ 2-1 2 2-2 Set 2-3 2-4 ~IOMINAL CYI INDER aIZE:: 6 X 12, ~REA: 28.27 SCl. in. UNI ,ESS NOIEI3 ERE: TYPE "A" CONE I:RA_C_TURE. U_N_L_E_SS_~N_Di_CL,Jg_D_O_T..H_E_R_W1,5__E_! .N_N.9_.T~..S_ .......... TEST RESULTS COMPLY WITH PROJECT SPEC UNLESS INDICATED "NON-COMPLIANCE" IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING INC. ARE PER APPLICABLE AS'I~I STANDARDS C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PE~'ASTM C31, TESTED PER ASTM~3~ Soilt~ch Engint~Iiog~n~'I-J~stin~ Inc. James M. Perdue Materials Testing Manager 2502 Gravel Dri~/e · Fort Worth, Texas 76118 · 817.595 0064 telephone · 817.589.7279 metro · 817.595.0708 fax