Loading...
Latter-day-CS 940121D,~F~ M. DOWDEY AND ASSOCIATES,~, C. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 January 21, 1994 Michaei A. Martin City of Coppell Engineering Department 255 E. Parkway Boulevard Coppell, Texas 75019 Re: The Church of Jesus Christ of Latter-Day Saint~ Dear Mr. Martin: Our office has completed the revisions as discussed dated December 20, 1993. All comments were addressed except for one. Item No. 4 requested a 4:1 slope o the detention ponds, however, due to size limitation requirements the ponds are sized with 3:1 side slope~ the detention pond general notes, th~se slopes will with jute mesh or equal soil stabilizing material. ~ also be sodded. Please consider our request to allow for 3:1 slope~ and if you have any questions or comments please ca Sincerely, MSD; j rb ' .n your letter and corrected m the berms in s and capacity As shown on be reinforced Ne slopes will on the ponds .1 me anytime.