Loading...
ST9302-CS010413FROM : M-CO CONSTRUCTION INC. PHONE NO. : 817 589 9155 Apr. 13 2001 09:13AM P2 M-Co Construction, inc. 6816 Harmonson N. Richland Hills, Texas, 76180 OFFICE: Metro (817) 589-7601 FAX: Metro (817) 589-9155 April 13, 2001 Robert Weber Ed Bell Construction, Inc. 10605 Harry Hines Blvd. Dallas, Texas 75354-0787 RE: Sandy Lake Road - DWU Contract No. 98-311F/312F DVVU 30' Water Main Relocation Dear Mr. Weber The following information was requested by Harold Baha (DWU Relocation Project Manger) in a letter to Mr. Ken Griffin, P.E. with the City of Coppell on April 10, 2001(Enclosed). 1. How many shutdowns are proposed? We are requesting 2 shutdowns - The first is for Relocations # 5 and #6 The second is for Relocation #7 2. What date is scheduled for the shutdown(s) to begin? The first to start on April 23rd at 6 AM and end on April 24th no later than 6 PM. Tl~e second date is unknown at this time due to a conflict with a telephone conduit. 3. What is the duration of the shutdown(s)? The first shutdown is for 36 hours for two lowerings The second shutdown will require 24 hours for one lowering. The dates we have scheduled can be changed to meet DWU's requirements. I will need as much notice as possible to reschedule Hanson°s weldem. if the telephone conduit can be relocated by Friday, April 20, 2001. We can have the line closed, tested, and ready for tie-ins on Monday, April 30, 2001. If you need additional information please feel free to contact me. Estimator M-CO Construction, Inc. c: M. DeMotte (Kimley-Horn) Hamid Baha (DWU) Ken Griffin (City of Coppell)