Loading...
ST9302-CS000329FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 March 29, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DVvqJ Project #: 9R-311F Dear Mr. Griffin: Approximately 120 linear feet of 36" RCP storm sewer and a grate drop inlet are in conflict with the Coppell 30" water line that needs to be extended across the Sandy Lake/MacArthur intersection. We have assumed that the City will want to replace the storm sewer line and inlet that will need to be removed. The following existing pay items will be affected by this work: Item Description QW Umt Unit Price Extension 9 Remove Existing Inlet 1 EA $500.00 $500.00 10 Remove Existing RCP 120 LF $I0.00 $1,200.00 33 36" CL III RCP 120 LF $66.00 $7,920.00 49 Std 2 Grate Drop Inlet 1 EA $2,500.00 $2,500.00 Since the future MacArthur/Sandy Lake intersection improvement project will eliminate the need for the storm sewer line affected by this water line extension and will ultimately result in the removal of whatever we replace, new RCP doesn't need to be installed at this location. As a cost reduction measure, we propose relaying the RCP that we remove under item 10 and match the existing line and grade. Our price for relaying 36" RCP is $40.00 per LF. Please/nfom'- our office of your decision rcgard~g t_his work. If you have any questions regarding this issue, don't hesitate to contact our office. W~eb.e;~ lYc'o .n s tm c t~io[ Company Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER