Loading...
ST9302-CS000324FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 March 24, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: It is our understanding that seven (7) additional full circumference welds will be required to install the cross and 30" gate valve near the pump station on Kimbel Kourt prior to installation of the remainder of the water line extension. This construction sequence was directed by the City to facilitate reducing production at the pump station prior to the heavy water usage season. Our contract with the City includes an item for full circumference welds; however, it is in the Dallas Water Utilities section of the contract. Please add this item to the City of Coppell section of the contract on the next change order. If you have any questions regarding this price, don't hesitate to contact our office. Sincerely, . h 11 Cons ction Company Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER