WA9302-LR 960115 (3)[''EOTECHNICALE I GEE Consultants, Inc.
E
I NVIRONMENTAL
2540 Glenda Lane * Suite ]08 * Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
REINFORCING STEEL PLACEMENT
Report Date January 15, 1996 Test Date: January 9, 1996
Client City of Coppell General Report No.: 12
Project 6.0 MG Water Storage Tank Project No.: 95-196
Identification Field Inspection of Reinforcing Steel
Method of Test Visual Inspection
Results
On January 9, 1996 a representative of GEE Consultants, Inc. was present at the above
referenced project to perform reinforcing steel inspection:
Wall panels WB-3, WC-3
Dome Panels 5D-5, 4D-5, 5E-5, 6E-5, 2B-7, 2A-7, 1A-7, 4A-7, 5A-7, 6A-7, 3A-7,
3B-7, 4B-6, 5B-6, 6B-6, 3C-6, 6C-6, 4C-6, 5C-6, 6D-6, 6F-5
The following discrepancies were noted and called to the attention of Bob, a representative of Natgun.
Form 6C-6 piece of #4 steel too short.
The above discrepm~cies were corrected as noted.
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimek, Jacobs m~d Finklea