ST9302-CS000229FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 February 29, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: We are in receipt of your February 14, 2000 letter regarding the proposed change order for the extension of Sandy Lake Road from MacArthur Boulevard to Kimble Court. You have chosen to calculate the price for several overhead and extra work items by utilizing a straight line extrapolation methodology with the prices for the existing Sandy Lake Road project serving as the baseline. We do not concur with your methodology for calculating these approximate prices since Sandy Lake Road is a relatively clean project when compared to the proposed intersection work included in the change order and thus do not agree with your valuation of the project. Based upon your contention that EBCC modified the bid quantities for unclassified street excavation, lime subgrade, hydrated lime, 8" concrete paving, 6" concrete curb, and 4" topsoil, I have reviewed the quantities and items utilized to develop prices for this change order. Our records indicate that we utilized the bid form provided by your office and didn't modify any of the quantities other than for items 43 and 44 and for the pavement marking item. These quantities were either adjusted because no quantities were provided or no item was provided on the bid form. Although we are certain that some adjustments could be made to our prices, we are equally certain that the value of this work significantly exceeds the value you have placed on the work. In accordance with our previous phone conversation regarding this subject, it appears that concessions by either party will not significantly close the valuation gap and the only viable option for the City of Coppell is to competitively bid this project. If you have any questions regarding this infom~ation, don't hesitate to contact our office. Sincerely, ~o~tmc~.~Company ~ Robert D. Weber Project Engineer xc: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER